Mechanical completion specification

Páginas: 25 (6035 palabras) Publicado: 8 de marzo de 2010
|CLIENTE: TRANSPORTADORA DE GAS NATURAL DE LA HUASTECA, S. DE R. L. DE C.V. | |
|LOCALIDAD: | |
|OBRA:|DOC No. |
|REV |A |0 | |Pag. 1 de 36 |
|MECHANICAL COMPLETION SPECIFICATION |
||
| |
| || | | | | | | |
| | | | | | | |
| | | | || | |
|0 |TERMINACIÓN MECÁNICA |AGA |KAM |PAC |ELD |22-OCT-06 |
|A |PARA APROBACIÓN |KAM |ADL |PAC |ELD |22-JUL-06 |
|REV |EMITIDO PARA|POR |VERIFICÓ |REVISÓ |APROBÓ |FECHA |

TABLE OF CONTENTS

1. INTRODUCTION 4

2. REFERENCE DOCUMENTS 4

3. Definitions 5

4. MECHANICAL COMPLETION SYSTEM DESCRIPTION 6

5. COMPLETION SYSTEM PHASES 8

5.1 General 8

5.2 Fabrication Completion 8

5.3 Pre-Commissioning 9

5.4 Mechanical Completion 10

6. SystemS ANDSUBSYSTEMS 10

6.1 Scope 10

6.2 System MC Identification. 10

6.3 Systems AC–1 Identification. 11

6.4 Systems and Subsystems Priority. 12

7. Certification & RECORDING System 13

8. PuNCH LISTS System 14

9. NONCONFORMANCE REPORTING 14

10. TECHNICAL QUERIES 15

11. dossierS 15

11.1 Description 15

11.2 Fabrication Records Dossier 16

11.3 SAC Acceptance RecordDossiers. 18

11.4 MC DOSSIER 21

12. attachments 22

LIST OF ATTACHMENTS

1. ATTACHMENT No. 1 - NOTICE OF MECHANICAL COMPLETION
2. ATTACHMENT No. 2 - MECHANICAL CERTIFICATE PER SUBSYTEM MC-1 / AC-1 / SCA - 1
3. ATTACHMENT No. 3 - COMPLETION DATA STRUCTURE
4. ATTACHMENT No. 4 - PROJECT CERTIFICATION FLOW CHART
5. ATTACHMENT No. 5 - LIST OFSUBSYSTEMS
6. ATTACHMENT No. 6 - LIST OF P&IDRAWINGS

INTRODUCTION

1. This document is intended to serve as a basis for a common understanding between Company and Contractor about the conditions to be met in order to achieve the Mechanical Completion of the System as defined in the Engineering, Procurement and Construction Contract for the Tamazunchale Pipeline Project between Transportadorade Gas Natural de La Huasteca, S. de R. L. de C.V. and Techint S.A. de C.V. The EPC contract.

2. The purpose of this specification is to establish the steps required to achieve the Mechanical Completion of the Tamazunchale Pipeline Project thus providing the facility to track and monitor all inspections, tests, check-outs and in general all completion activities until the issuing of the...
Leer documento completo

Regístrate para leer el documento completo.

Estos documentos también te pueden resultar útiles

  • mechanical propierties
  • Mechanical waves
  • Manual de mechanical
  • System Specification
  • Mechanical Engineering
  • Specification Ups Forza
  • “WPS: Welding Procedure Specification”
  • Software Requirements Specification 1.3

Conviértase en miembro formal de Buenas Tareas

INSCRÍBETE - ES GRATIS