Priorizacion De Tareas

Páginas: 7 (1542 palabras) Publicado: 6 de mayo de 2012
MTTR 4.50

PRIMARY CRUSHING - JANUARY
CR001 SPIDER ASSEMBLY LOOSEN

4.00

Downtime Cat Production Period
AREA COLOQUIAL 01 Primary Crushing 01 Primary Crushing 01 Primary Crushing 01 Primary Crushing 01 Primary Crushing 01 Primary Crushing 01 Primary Crushing 01 Primary Crushing 01 Primary Crushing 01 Primary Crushing 01 Primary Crushing 01 Primary Crushing 01 Primary Crushing 01 PrimaryCrushing 01 Primary Crushing 01 Primary Crushing

Breakdown Loss ene-12
EQUIPO CR001 CR001 CR001 CV001 CV001 CV001 CV001 CV001 CV001 CV001 CV001 CV001 CV002 FE001 RB001 RB001 Total 01 Primary Crushing D/N N/Q FAILURE ELECTRIC MOTOR TRIP FALSE CONTACT SPIDER ASSEMBLY LOOSEN CARD DAMAGED CONTROL LOGIC INCIDENT FALSE CONTACT FALSE INDICATION IDLER & FRAMES DAMAGED MAGNET FAILURE METAL DETECTORFAILURE RED FAILURE SENSOR DAMAGED SENSOR DAMAGED CONTROL DAMAGED CONTROL DAMAGED CYLINDER DAMAGED Q 16 0.77 1.31 Cuenta de FAILURE 1 1 1 1 1 1 2 1 1 4 1 1 2 1 1 1 N 21 Suma de Maintenance Time Hr 0.25 0.52 4.27 0.40 0.92 0.60 0.55 0.48 0.42 2.30 0.03 0.17 1.00 1.20 0.57 2.48 D 16.15 Máx. de MTTR 0.25 0.52 4.27 0.40 0.92 0.60 0.28 0.48 0.42 0.58 0.03 0.17 0.50 1.20 0.57 2.48 D/N 0.77 0.77 0.77 0.770.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 N/Q 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 PRIORIZACION ETIQUETA CR001 ELECTRIC MOTOR TRIP CR001 FALSE CONTACT CR001 SPIDER ASSEMBLY LOOSEN CV001 CARD DAMAGED CV001 CONTROL LOGIC INCIDENT CV001 FALSE CONTACT CV001 FALSE INDICATION CV001 IDLER & FRAMES DAMAGED CV001 MAGNET FAILURE CV001 METALDETECTOR FAILURE CV001 RED FAILURE CV001 SENSOR DAMAGED CV002 SENSOR DAMAGED FE001 CONTROL DAMAGED RB001 CONTROL DAMAGED RB001 CYLINDER DAMAGED

3.50

3.00
RB001 CYLINDER DAMAGED 2.50

A A C

2.00

1.50

FE001 CONTROL DAMAGED

C

1.00

CV001 CONTROL LOGIC INCIDENT

C A A

0.50

CV002 SENSOR DAMAGED
CV001 FALSE INDICATION

CV001 METAL DETECTOR FAILURE

0.00 0 0.5 1 1.5 2 2.53 3.5 4 4.5 EVENTOS

MTTR

PRIMARY CRUSHING - FEBRUARY

1.80

1.60

CR001 VARIATOR/STARTER DAMAGED

Downtime Cat Production Period
AREA COLOQUIAL 01 Primary Crushing 01 Primary Crushing 01 Primary Crushing 01 Primary Crushing 01 Primary Crushing 01 Primary Crushing 01 Primary Crushing

Breakdown Loss feb-12
EQUIPO CR001 CV001 CV001 CV002 CV002 FE001 FE001 Total 01 Primary CrushingD/N N/Q FAILURE VARIATOR/STARTER DAMAGED FALSE INDICATION IDLER & FRAMES DAMAGED FALSE INDICATION VARIATOR/STARTER DAMAGED FALSE INDICATION SENSOR DAMAGED Q 7 0.43 1.14 Cuenta de FAILURE 1 1 1 1 1 1 2 N 8 Suma de Maintenance Time Hr 1.57 0.15 0.20 0.67 0.62 0.13 0.13 D 3.47 Máx. de MTTR 1.57 0.15 0.20 0.67 0.62 0.13 0.07 D/N 0.43 0.43 0.43 0.43 0.43 0.43 0.43 N/Q 1.14 1.14 1.14 1.14 1.14 1.14 1.14PRIORIZACION A ETIQUETA CR001 VARIATOR/STARTER DAMAGED CV001 FALSE INDICATION CV001 IDLER & FRAMES DAMAGED CV002 FALSE INDICATION CV002 VARIATOR/STARTER DAMAGED FE001 FALSE INDICATION FE001 SENSOR DAMAGED

1.40

1.20

1.00

A A C

0.80 CV002 FALSE INDICATION
0.60

CV002 VARIATOR/STARTER DAMAGED

0.40

0.20
FE001 SENSOR DAMAGED 0.00 0 0.5 1 1.5 2 2.5

EVENTOS

Downtime CatProduction Period
AREA COLOQUIAL 01 Primary Crushing 01 Primary Crushing 01 Primary Crushing 01 Primary Crushing 01 Primary Crushing 01 Primary Crushing 01 Primary Crushing 01 Primary Crushing 01 Primary Crushing

Breakdown Loss mar-12
EQUIPO CR001 CR001 CR001 CV001 CV001 CV002 CV002 CV002 CV002 Total 01 Primary Crushing D/N N/Q FAILURE HYDRAULIC SYSTEM DAMAGED DEVICENET FAILURE LUBE SYSTEMFAILURE FALSE INDICATION IDLER & FRAMES DAMAGED ELECTRIC MOTOR TRIP IDLER & FRAMES DAMAGED SENSOR DAMAGED VARIATOR/STARTER DAMAGED Q 9 1.09 1.22 Cuenta de FAILURE 2 1 1 2 1 1 1 1 1 N 11 Suma de Maintenance Time Hr 8.43 0.22 0.43 0.47 0.53 0.12 0.67 0.90 0.20 D 11.97 Máx. de MTTR 4.22 0.22 0.43 0.23 0.53 0.12 0.67 0.90 0.20 D/N 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 N/Q 1.22 1.22 1.22 1.22 1.22...
Leer documento completo

Regístrate para leer el documento completo.

Estos documentos también te pueden resultar útiles

  • COACHING PRIORIZACIÓN DE TAREAS
  • Priorizacion de la eduacion
  • Matriz de priorizacion
  • Criterios De Priorización
  • Criterios De Priorizacion
  • Matriz priorización
  • priorizacion en salud
  • Priorizacion De Proyectos

Conviértase en miembro formal de Buenas Tareas

INSCRÍBETE - ES GRATIS