Aire comprimiro
SERVICIOS E INSTALACIONES MINERAS
BERAÚN CARRIÓN WILLY
Plano Isométrico
Equipos Usados
Tramo
CD
Equipo
PerforadoraT4b4(2) Winche (1)
Q CFM
140 160 140
Equipo total
280 320 420 320 280 320 280
Fs
1 1 1 1 1 1 1
5%fugas
1.05 1.05 1.05 1.05 1.05 1.05 1.05
Q total
294 336 441 336 294 336 294
EFPerforadora DM45(3)
Winche (2)
GH Perforadora T4b4(2) Winche (2) Pala Cabo(1)
160
140 160 280
Datos de mina
Altura de mina : 4500msnm PMINA
=
0.563 bar
ρ aire
PTRABAJO
=
=
0.680824284 Kg/ m3
6 bar = 620.6 KPa
Cálculo de Φ de tuberías
Tubería Principal AB:
3 3 3 = 2331 0.680824284 3 1 0.3048 60 3
= 0.7489
2 =
620.6 + 56.30.7489 56.3 2 = 9.005 = 4 0.7489 9.0057
= 0.12299 = 4.84"=5”
Tubería CD
3 3 3 = 630 0.680824284 3 1 0.3048 60 3 = 0.2
=
4 0.2 9.0057
= 0.0635559 = 2.5" = 3" Tubería EF
3 3 3 = 777 0.72919 3 1 0.3048 60 3 = 0.25
=
4 0.25 9.005 7
= 0.07106 = 2.79" = 3"
Tubería GH
3 3 0.72919 3 1 0.30483 min 60 3 = 0.296= 924
=
4 0.296 9.005 7
= 0.077744 = 3.1" = 4"
Tramo
AB
QCFM
2331
Ф(pulg)
5
Accesorios
Codos Tees Válvulas Reductor Total LTOTAL Codos Tees Válvulas ReductorTotal LTOTAL Codos Tees Válvulas Reductor Total LTOTAL Codos Tees Válvulas Reductor Total LTOTAL
Long. Equivalente(m)
2(2) = 4 2.5(1) = 2.5 1.6(2) = 3.2 0 9.7 300 + 9.7 = 309.7 1.3(3) = 3.9 1.5(2) = 31.6(3) = 4.8 2(1) = 2 13.7 250 + 13.7 = 263.7 1.3(3) = 3.9 1.5(2) = 3 1.6(2) = 3.2 2(1) = 1 11.1 200 + 11.1 = 211.1 1.6(4) = 6.4 2(3) = 6 2(1.3) = 2.6 1(2.5) = 2.5 17.5 300 + 17.5 = 317.5
CD630
3
EF
777
3
GH
924
4
Pérdida de Presión
Tramo AB CD Perdida C/100m (X PSI) 0.3527 0.3613 Longitud (pies) 1016.0761 865.157 Pérdida de P (PSI) 3.5 3.125
EF GH
0.5264...