Anita
ESIGN
C
RITERIA
L I Q U I D L OAD E R D ES I G N I N F O R MATI O N
Date:
Project:
Location (city, state, zip):
Distributor:
Phone:
Contact:
END VIEW
CANOPY
PLATFORMType of Requirement
Desired Materials of Construction:
Rack Identification
1) Metals:
❏ Other
Quantity
Top Loading ❏
Bottom Loading ❏
Tank Trucks ❏
Rail Cars ❏
Will theproduct be: Splash-loaded ❏
Vapor Recovery ❏
2) Desired Seals: ❏ BUNA ❏ VITON® ❏ TEFLON® ❏ Neoprene
❏ EPT
Sub-surface ❏ or Tight-fill ❏
Features
Is Shut-off Valve Required? ❏ Yes ❏ NoMaterials to be Transferred
Product to be handled
❏ Other
Loading Arms to be: ❏ Right Hand ❏ Left Hand
If Tight-fill, specify connection
Temperature
❏ Carbon Steel ❏ Aluminum ❏ 316Stainless Steel
Viscosity
SSU
˚F, Concentration (if applicable)
Will Arm Retain Product?
❏ Yes ❏ No
Location of valve on arm____________________________________
SpecialCharacteristics
Desired Type of Valve______________________________________
Sizes & Capacities
Will Valve be Used to Shut Down Line? ❏ Yes ❏ No
Inlet connection type?
Inlet Pipe Size 2"❏ 3"❏ 4"❏ 6"❏Vapor Pipe Size 1"❏ 2"❏ 3"❏ 4"❏
Max. PSIG
Discharge Rate
42
Working PSIG
GPM
D
ESIGN
C
RITERIA
TOP VIEW
MIN
X
MA
RISERS
ISLAND
Will Additional Equipment be Added byOthers?
E Ground Level to Overhead Obstruction
(Specify Weight & Location)
H Top of Tank to Top of Safety Rail
❏ Electrical Tracing
lbs/ft
L1 Number of Risers
❏ Insulationlbs/ft
L2 Distance Between Risers
❏ Hose
Distance Between Openings
❏ Valve/Fitting
❏ Other
Bottom Loading/Unloading
Other Desired Features:
I Ground Level to CL Tank Connection
JGround Level to Top of Riser
K CL of Riser to Tank Fitting:
Dimensional Data: Top Loading/Unloading
A CL of Riser to CL of Tank Opening:
Max.
Max.
Min.
L1 Number of Risers
Min.
L2...
Regístrate para leer el documento completo.