Aprovacion Demoldes
CYCLE TIME
MACHINE
CAPACITY
400 Ton.
WEIGHT NET
113.4 gr.
Review
/
/
ID CARD YUDO
Part / Runner
TAE WOO
Approved
/
/
20
VENDOR
NAME
TAW MEXICANA1/1
VENDOR
ETA
22-Jan-10
INJETION
DATE
25-Jan-10
TOOL NUMBER
NUMBER OF
CAVITIES / STEPS
HQ Ref
Real
---
4
N/A
MOLD CHECK LIST
MOLD ARRIVE CONDITIONS
No.
12
No.
1
2
3
4
5
6
7
8
9
10
Inspected Items
Has the mold arrived in good conditions?
Are the mold file and drawing included?
Description
Check-Up Result
YES
YES
Remark
OKOK
NO
NO
SPARE PARTS LIST
Qty.
Spec
Remark
MOLD OPERATING INSPECTION
No.
Inspected Items
Check-Up Result
YES
NO
1
Is the material feed appropriate?
YES
NO
2
Is theorientation of material rolling right?
YES
NO
3
The scrap discharge on die plate operate correctly?
YES
NO
4
Are the ejector pin and guide lifter operating soft?
YES
NO
5
Have a good court andbent the punchs on stripper plate?
YES
NO
Is the position and size of pin's right?
6
YES
NO
7
Is the die block correctly instaled on press mold?
YES
NO
8
The material fit appropriately ondie plate?
YES
NO
The springs operate correctly?
9
YES
NO
10
The material ejecting appropriately?
Remark for tooling problems, include countermeasures:
Remark
OK
OK
OK
OK
OK
OK
OK
OKOK
OK
No mold problem
PRODUCT CHECK LIST
MATERIAL INSPECTION
No.
Inspected Items
GOOD
1
Material without Deformation
GOOD
2
Material without Scratch
GOOD
3
Material without FlashGOOD
4
Condition of Process (Blanking, Bending , Piercing, Etc)
GOOD
5
Material Without Oxidation
GOOD
6
Material without Roughness
GOOD
7
Material without Oil and grease
GOOD
8Material without Contamination
GOOD
9
Material without roll marks
GOOD
10
Printing Code Material
Remark for other product problem:
No material problem
/
Check-Up Result
ACCEPTABLE
NOT...
Regístrate para leer el documento completo.