Arquitectura
CALCULO DE LAS HIPOTENUSAS Y ANGULOS DE LAS AREAS A1, A2, A3 Y A4.
Hip=(cat.op.)2+(cat.ady.)2
Hip=63.202+280.002
Hip= 287.04m
A1=b⋅h2∴280.00⋅63.202=8848m2
α⇒tanα=63.20280.00∴tanα=0.23
α=tan-10.23
α=13∘
β⇒tanβ=280.0063.20∴ tanβ=4.43
β=77∘
Hip=(cat.op.)2+(cat.ady.)2
Hip=128.002+141.602
Hip= 190.88m
A2=b⋅h2∴128.00⋅141.602=9062m2α1⇒tanα=141.60128.00∴tanα=1.11
α1=tan-11.11
α1=47∘
β1⇒tanβ=128.00141.60∴ tanβ=0.90
β1=43∘
cos43∘=cat.ady.Hip∴cos43∘=altura190.88
altura=cos43∘⋅190.88
altura≈140m
A3=b⋅h2∴345.60⋅140.002=24192m2
Hip=(cat.op.)2+(cat.ady.)2
(287.04)2=x2+(220)2
82391.96=x2+48400
x2=82391.96-48400
x=33991.96
x=184.37m
A4=b⋅h2∴184.37⋅220.002=20280.60m2
ΣAreas=62383m2DELEGACION MIGUEL HIDALGO.
CALCULO DE COS, CUS, # NIV., AREA LIBRE, AREA LIBRE PERMEABLE Y AREA LIBRE NO PERMEABLE.
COS (COEFICIENTE DE OCUPACION DE SUELO)
COS 50%∴62383m2×0.50=31191.5m2 const.PB
CUS (COEFICIENTE DE USO DE SUELO)
CUS 85%∴62383m2×0.85=53025.55m2
#NIV=Tm2const.CUSTm2P.B.COS=53025.5531191.5=1.7≈2 NIV
m2 por planta= 53025.552 =26512.78 m2P.B.y 1er.nivel
AREALIBRE PERMEABLE = 25%
m2 Jardín=62383×.25=15595.75m2 Jardín
AREA LIBRE PERMEABLE=62383-31191.5m2 AREA LIBRE PERMEABLE
AREA LIBRE NO PERMEABLE=31191.5-15595.75=15595.75m2 A. L. NO PERM.
CENTRO DEPORTIVO
SOCIOS: 30000 SOCIOS
DEPORTE | DEPORTISTA ESPECIALIDAD% | SOCIOS | HOMBRES | MUJERES |
Futbol soccer | 22% | 6600 | (98%)6468 | (2%)132 |
Baloncesto | 20% | 6000 | (75%)4500 |(25%)1500 |
Voleibol | 14% | 4200 | (40%)1680 | (60%)2520 |
Atletismo | 2.5% | 750 | (82%)615 | (18%)135 |
Box | 18% | 750 | (100%)750 | (0%)- |
Natación | 6% | 5400 | (60%)3240 | (40%)2160 |
Gimnasia | 0.5% | 1800 | (40%)720 | (60%)1080 |
Lucha | 2% | 150 | (100%)150 | (0%)- |
Futbol de salón | 2.5% | 600 | (100%)600 | (0%)- |
Frontón | 4% | 750 | (100%)750 | (0%)- |
Tenis |5.5% | 1200 | (65%)780 | (35%)420 |
Artes marciales | 5.5% | 1650 | (70%)1155 | (30%)495 |
Tenis de mesa | 0.2% | 60 | (60%)36 | (40%)24 |
Levantamiento de pesas | 0.3% | 90 | (100%)90 | (0%)- |
Datos:
Tiempo de serv.=13hrs (780min.)
CALCULO DE CANCHAS DE FUTBOL SOCCER
Soccer
(0.22) (30000)=6600
(0.98) (6600)=6468 Hombres
(0.02)(6600)=132 Mujeres
DIA CRITICO=22 de socios dela pob. Representativa de soccer
(6600)(0.22)=1552 socios
(6468)(0.22)=1423 hombres
(132)(0.22)=29 mujeres
TIEMPO=13hrs
a) 110min.-Tiempo de juego por partido
b) =11×2=22 cancha
5×2=10suplentes32socios para soccer
1hr=60min
13hrs=x 110min.tiempo de juego
⤷780min.
780min.110min.=7.09 de partidos/dia
7 partidos×32 socios=224socios por dia1452224=6.486 ≈canchas
Por género
1423224=6.35≈6 Canchas
132224=0.58≈1cancchas7canchas
Datos:
Tiempo de serv.=13hrs.
CALCULO DE CANCHASVDE BASQUETBOL
Basquetbol
(0.20)(3000)=6000
(0.75)(30000)=4500 Hombres
(0.25)(30000)=1500 Mujeres
DIA CRITICO=22% de socios de la pob.Representativa de basquetbol
(6000)(0.22)=1320 socios
(4500)(0.22)=990 hombres
(1500)(0.22)=330 mujeres
Tiempo=13hrs
70min-Tiempo de juego por partido
5x2=10 en cancha
8x2=16 en banca26 socios para basquetbol por partido
1hr=60min.
13hrs.=x 70min.tiempo de juego
⤷780min.
78070=11.14≈11partidosdia/basquetbol11partidosx26socios/partidos/basquetbol=286socios/dia/basquetbol
1320socios/dia286sociospartidos/dia=4.61≈5canchas
Por género
990286=3.46≈3≈canchas o 4canchas
330286=1.15≈1cancha
4 canchas ó 5 canchas
Datos:
Tiempo de servicio= 13 hrs.
CALCULO DE CANCHAS DE VOLIBOL
Volibol...
Regístrate para leer el documento completo.