10 steps for slurry pump system checking beforerunning (1) The pump should be placed on a solid foundation to bear the full weight, and tighten all the foot bolts to prevent vibration. (2) The pipingand valves should be added supports,no pressure allowed on the pump. (3) For the Expeller seal with Gland Seal or Packing seal, run the pump with hands, the shaft should be able to drive theimpeller, there should be no friction, otherwise you should adjust the impeller gap (for mechanical seal slurry pump, the impeller gap no need to be adjusted, when mechanical seal installed correctly.) (4)Disengage the coupling, start the motor,check rotation direction, and should ensure that the pump shaft rotates the direction of the arrow marked on the pump body, to prohibit motor reverse, or theimpeller will come off and cause an accident. (5) Direct driven should make the pump shaft and motor shaft should be in line accurately, in order to avoid vibration and wear. (6) Install removable shorttube or expansion joints in the suction pipe of the pump, and its length should be sufficient to disassemble the pump cover and replacement of the wearing parts, in order to maintenance the pumpeasily. (7)Expeller seal combined with packing seal should check the at leakage first . Open the seal water before starting, if the leakage amount is too large, should tighten the packing nut until the leakguttate date. After the pump working, if the leakage amount is small, and the packing heats, it should be appropriate to release the gland nut; if the packing continues to heat, stop the pump, andcool it, adjust the gland nut, relax packing, so that the leakage amount slightly increases, re-start the pump, when the packing run well with shaft sleeve together, and then adjust the gland nuts toreduce the leakage. (8)For mechanical seal, it should be checked before starting the pump: connected mechanical seal with shaft seal water pipeline (The shaft seal water line should be cleaned up of...
Leer documento completo

Regístrate para leer el documento completo.

Estos documentos también te pueden resultar útiles

  • bombas de lodo
  • Descarga De Lodos Con Bomba Peristalticas
  • Bomba de lodos torre
  • Bombas De Lodo
  • Bombas de lodos
  • Bomba De Lodos
  • Bombas De Lodo
  • Calculo Bombas Lodos

Conviértase en miembro formal de Buenas Tareas

INSCRÍBETE - ES GRATIS