Borgwarner morse tec mexico profits pools
October, 2008
Step 1 - Define the pool
Determine which value-chain activityinfluence profits now and in the future: Logistic and Row Material Acquisition Components Manufacturing Time Systems Assembly Scrap and waste Expedite Freight OEM Sales toAutomotive Industry Time System Hemi 5.7 for Chrysler Engine $69.45 $9.16 $18.22 $4.85 $3.39 $79.33 $185.00
2
MORSE TEC MEXICO
Step 2 - Determine the size of the poolDevelop a baseline estimate of cumulative profits generated by all profit pool activities Time System Hemi 5.7 for Chrysler Engine
$79.93 43.21%
$185.00
$18.22 $9.16 $69.454.95% 9.85%
$4.85 2.62%
$3.39 1.83%
$105.07
100%
56.79%
37.54%
Logistic and Row Material Acquisition
Components Manufacturing
Time Systems AssemblyScrap and waste
Expedite Freight
Manufacturing Sub-Total
OEM Sales to Automotive Industry
Time System Hemi 5.7 for Chrysler Engine
3
MORSE TEC MEXICO
Step 3 -Determine profit distribution
Develop estimate of the profits generated by each activity
50%
Operating margin
Logistic and Row Material Acquisition
ComponentsManufacturing
Scrap and waste
Expedited Freight
Time Systems Assembly
OEM Sales to Automotive Industry
0%
Share of industry revenue
100%
MORSE TEC MEXICO
4Step 4 - Reconcile the estimates
According to the profit distribution the system assembly is the activity that gives the greater return of investment for the product, andit is true because it reduces a significant part of the assembly time of the engine in the motor assembly plant of Chrysler in Ramos Arizpe.
5
MORSE TEC MEXICO
Regístrate para leer el documento completo.