Bougi
Páginas: 2 (295 palabras)
Publicado: 5 de abril de 2011
In the shed of repairs majors zero hour isrealised the maintenance of all the wagons of the train, that is to say, are disconnect, all the wagons and all the elements are disarmed that disarm all the elementsthat compose the wagon,these are: units of conditioned air (A.C), coffer of circuit breakers, coffer of high voltage, bus of low tension bogui and elements of the bodyof the wagon.
In this productive system we will analyze one of the parts that compose bogui as it is it the reducer factory of speeds.
This factory consists of alength of 20mx10m, divided for two company (Althoms and Metro of Caracas) where the general overhaul is realised of reducers to disarm, to inspect, to change, and toassemble which turn this into a production chain.
The infrastructure of this shed it owns one height of approximately of 6 meters, with natural ventilation,illumination to pave and electrical in a combined ceiling of asbestos and transparent laminae of fiber glass, with walls of blocks, prefabricated columns, water systems servedand white waters.
This subsystem consists of electrical systems as they are them 36 lamps from bells of 220v, 8 take currents of 110v, 4 of 220v, 3 of 440v.Pneumatic facilities with a 20 compressor SULLAM from 0 to pressure bar Between the mechanical facilities we have a crane bridge of 5 tons and another radial crane of 2 tons.