Buena tarea

Páginas: 74 (18339 palabras) Publicado: 2 de febrero de 2011
SOFTWARE QUALITY ASSURANCE PLAN

TEMPLATE

TM-SQA-01 V2.0

DECEMBER 16, 2003

Systems Engineering Process Office, Code 212
Space and Naval Warfare Systems Center San Diego
53560 Hull Street
San Diego, CA 92152-5001

Approved for public release; distribution is unlimited

PREFACE

THIS DOCUMENT IS A TEMPLATE OF A SOFTWARE QUALITY ASSURANCE (SQA) PLAN USING THE GUIDELINESPROVIDED IN THE INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE) 730-1998, IEEE STANDARD FOR SOFTWARE QUALITY ASSURANCE PLANS, AND IEEE STD 730.1-1995, IEEE GUIDE FOR SOFTWARE QUALITY ASSURANCE PLANNING. THIS TEMPLATE SHOULD BE SUPPLEMENTED WITH PROJECT-SPECIFIC INFORMATION TO PRODUCE A SQA PLAN THAT ACCURATELY DESCRIBES THE PROJECT’S SQA ORGANIZATION, TASKS, ROLE, ANDRESPONSIBILITIES. THE PLANNING AND DOCUMENTING OF SQA ACTIVITIES MUST AGREE AND BE CONSISTENT WITH THE PROJECT’S SOFTWARE DEVELOPMENT PLAN (SDP) AND ANY OTHER PROJECT-PLANNING DOCUMENT. ADDITIONALLY, THE SQA PLAN MUST COMPLY WITH SPACE AND NAVAL WARFARE (SPAWAR) SYSTEMS CENTER (SSC) SAN DIEGO SQA POLICY, WHICH PROVIDES MANAGEMENT WITH APPROPRIATE VISIBILITY INTO THE PROCESS BEING USED BY THE SOFTWAREPROJECT AND OF THE PRODUCTS BEING BUILT.
This document supplements the SQA Process. Refer to Section 4, Create/Maintain SQA Plan, of the SQA Process for a description on the use of this template.
The SSC San Diego Systems Engineering Process Office (SEPO) assumes responsibility for this document and updates it as required to meet the needs of users within SSC San Diego CA. SEPO welcomes andsolicits feedback from users of this document so that future revisions will reflect improvements, based on organizational experience and lessons learned.
Users of this document may report deficiencies or corrections using the Document Change Request (DCR) found on the next page or online through the SSC San Diego Process Asset Library (PAL) at http://sepo.spawar.navy.mil/. Updates areperformed in accordance with the SEPO Configuration Management Procedure available on the SSC San Diego PAL.

DOCUMENT CHANGE REQUEST (DCR)
|DOCUMENT TITLE: SOFTWARE QUALITY ASSURANCE PLAN TEMPLATE |TRACKING NUMBER:       |
|Name of Submitting Organization:      |
|Organization Contact:       |Phone:       |
|Mailing Address:       |
|Short Title:      |Date:       |
|Change Location:       |
|(use section #, figure #, table #, etc.) |
|Proposed change:      |
| |
| |
||
| |
| |
|...
Leer documento completo

Regístrate para leer el documento completo.

Estos documentos también te pueden resultar útiles

  • una buena tarea
  • Buena Tarea
  • buena tarea
  • Buena Tarea
  • buena tarea
  • Buena Tarea
  • Buenas tarea
  • Mi buena tarea

Conviértase en miembro formal de Buenas Tareas

INSCRÍBETE - ES GRATIS