Construction of Pit For Tank of Oil Lubrication System of Gum Calender
Goodyear - Peru
Revision date: 2013-08-08 Peter Cressman- Goodyear Akron

I. Scope:A small 700 mm deep pit needs to be constructed in the general area of column 32 on the South side of the gum calender machine.
II. Design Specification:
1. The locationand dimensions of the pit are per Goodyear sketch file named "2013-08-09 PIT DIMENSIONS LUBE SYSTEM.pdf".
2. The construction detail of how the pit is to be constructed is perdocument "Pit Construction Detail - 2013-06-11.pdf"
3. The general concrete specification for this project is per document CTI-060-03-0330 revision 20.
4. The weight of thetank device when full when placed into the pit is estimated to be 200 kg.
5. No drain is to be included at the bottom of the pit.

especificación
Construcción de pozo para eltanque del sistema de lubricación de aceite de Calendario Gum
Goodyear - Perú
Fecha de revisión: 08/08/2013 Peter Cressman-Goodyear Akron

I. Ámbito de aplicación:
Unpequeño pozo profundo 700 mm tiene que ser construido en el área general de la columna 32 en el lado sur de la calandria encías.
II. Especificaciones de Diseño:
1. La ubicación ylas dimensiones del foso son por archivo boceto Goodyear denominada "08/09/2013 PIT DIMENSIONES LUBE SYSTEM.pdf".
2. El detalle de la construcción de la forma en que el pozo seva a construir es por documento "Pit Detalle de construcción - 2013-06-11.pdf"
3. La especificación concreta general de este proyecto es por documento CTI-060-03-0330 derevisión 20.
4. El peso del dispositivo de depósito cuando está llena cuando se coloca en el pozo se estima en 200 kg.
5. No drenaje se va a incluir en el fondo de la fosa.