Construcción
AL 13 DE MAYO DEL 2012
METRADO
PROGRAMADO
PROC.
DESCRIPCION
UND
ORIG
SEMANA
RATIO S/. / UND
EJECUTADO
ACUM.
SEMANA
ANALISIS DEL VALORGANADO
% AVANCE
ACUM
SEM.
ACUM
ORIG.
SEMANA
ACUM.
S-23
MOVIMIENTO DE TIERRAS
ACxWP
CV
CPI
SPI
P-4B CORTE ROCA FIJA (RF)
0.25
5.25
0.25
5.25
1.4%29.2%
79,326.43
149,747.47
106,775.81
1,427,876
416,463.74
416,463.74
560,573
(144,109)
0.74
1.00
km
10.42
0.24
1.61
0.20
1.82
1.9%
17.5%42,932.00
1,157.65
43,636.68
447,351
69,270.14
78,136.24
79,419
(1,283)
0.98
1.13
m3
1,685,930.49
46,473.61
370,226.10
48,000.00
301,870.10
2.8%
17.9%6.47
4.75
5.57
10,900,220
2,393,661.01
1,951,711.91
1,680,720
270,992
1.16
0.82
m3
DESBROCE Y LIMPIEZA , CORTE EN MATERIAL SUELTO (MS), CORTE EN ROCA
SUELTA (RS) YREMOCIÓN DE DERRUMBES
18
42,305.61
1,432.93
5,914.97
1,150.00
9,637.51
2.7%
22.8%
30.52
30.29
32.85
1,291,315
180,545.50
294,170.28
316,585
(22,414)0.93
1.63
3,059,940.39
2,740,482.17
103,185.58
1.04
0.90
SUB TOTAL
OBRAS DE ARTE
14,066,761.99
2,637,296.59
Ing. Felipe Romero / Ing. Jorge Huarcaya
EXCAVACIÓNALCANTARILLAS TMC, MARCO, MURO, BADEN, GAVIÓN,
P-13A ENROCADO, PONTÓN, DEMOLICIÓN DE ESTRUCTURAS EXISTENTES,
RELLENO ALCANTARILLAS TMC, MARCO, BADEN, MUROS, PONTÓN
SUMINISTRO Y COLOCACIÓN DEALCANTARILLA D=0.90 M, D=1.20M Y
P-20A ALCANTARILLAS ABOVEDADAS
m3
m3
ml
138,122.15
3,610.52
10,471.61
460.00
1,851.45
0.3%
1.3%
22.70
79,308.78
2,134.71
6,092.90
195.001,322.53
0.2%
1.7%
36.76
2,143.57
57.69
434.90
57.00
347.42
2.7%
16.2%
570.01
25.36
47.64
3,135,387
237,706.59
42,028.10
88,201
(46,173)...