Contrato Modificatorio
ITEM
DESCRIPCION OBRAS PRELIMINARES, DEMOLICIONES Y MOVIMIENTOS DE TIERRA
UNIDAD DE MEDIDA
CANTIDAD DE CONTRATO
PRECIO UNITARIO
PRECIO TOTAL CONTRATO
INCREMENTO
CANTIDAD MONTO Bs.
DECREMENTO
CANTIDAD MONTO Bs.
ORDEN DE CAMBIO Nº1
CANTIDAD P. U. Bs. MONTO Bs.
% DE AVANCE
ACTUAL ACUMULADO
100 101 102 200 201 202 203 204 205 206 207 300 301 302303 304 305 306 307 308 309 310
OBRAS PRELIMINARES INSTALACION DE FAENAS MOVILIZACION Y DESMOVILIZACION REPLANTEO GENERAL (ESTRUCTURAS, PISOS, PAVIMENTO) DEMOLICIONES GENERALES ROTURA DE CARPETA ASFALTICA (Incluye carguío y transporte 13 km) DEMOLICION MAMPOSTERIA DE PIEDRA Y CIMIENTOS (Incluye carguío y transporte 13 km) DEMOLICION ESTRUCTURA DE HORMIGON ARMADO (Incluye carguío y transporte 13km) REMOSION DE ADOQUINES REMOSION DE BALDOSAS DE PIEDRA REMOSION DE CORDONES DE PIEDRA RETIRO Y COLOCACION DE POSTES DE LUZ INCLUYENDO BASE DE HORMIGON DE ANCLAJE MOVIMIENTO DE TIERRAS GENERALES (ESTRUCTURAS, SISTEMAS SANITARIOS,PLUVIALES, AGUA, GAS, TELECOMUNICACIONES,ELECTRICOS Y VIALES EXCAVACION C/ MAQUINARIA (Inc. carguío y transporte dentro el área de la obra) EXCAVACION MANUAL DE 0 A 2 MS/AGOTAMIENTO TERRENO SEMIDURO EXCAVACION MANUAL DE 2 A 4 M S/AGOTAMIENTO TERRENO SEMIDURO RELLENO Y COMPACTADO CON MAQUINARIA P/ REPOSICION (Inc. material de préstamo aluvial) ENTIBADO Y APUNTALADO CONTINUO ENTIBADO Y APUNTALADO DISCONTINUO DESAGÜE Y AGOTAMIENTO PROVISION Y COLOCACION MATERIAL GRANULAR PARA TUBOS ( E=10 cms) RELLENO Y COMPACTADO CON TIERRA CERNIDA (No incluye material) RELLENO YCOMPACTADO EN ZANJA CON MATERIAL COMUN (no incluye material) ACABADOS ARQUITECTONICOS ESTUDIOS AMBIENTALES MÓDULOS ANAQUELES (5)
Gbl m2
1 1435
28,772.46 21.49
28,772.46 30,838.15
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
1.000 1,435.000
28,772.460 30,838.150
100.00% 100.00%
100.00% 100.00%
m2 m3 m3 m2 m2 ml Pza
203 37 2.4 599 253.2 181.6 2
129.78129.78 148.25 43.28 43.28 42.39 1,446.58
26,345.34 4,801.86 355.80 25,924.72 10,958.50 7,698.02 2,893.16
0.000 60.620 7.810 40.760 163.250 132.660 0.000
0.000 7,867.260 1,157.830 1,764.090 7,065.460 5,623.460 0.000
65.150 0.000 0.000 0.000 0.000 0.000 1.000
8,455.170 0.000 0.000 0.000 0.000 0.000 1,446.580
137.850 97.620 10.210 639.760 416.450 314.260 1.000
17,890.17012,669.120 1,513.630 27,688.810 18,023.960 13,321.480 1,446.580
67.91% 263.84% 425.42% 106.80% 0.00% 0.00% 0.00%
67.91% 263.84% 425.42% 106.80% 0.00% 0.00% 0.00%
m3 m3 m3 m3 m2 m2 Hrs m3 m3 m3
861.82 110 193.56 220 85 168.31 30 28.83 297.43 850.2
76.70 29.67 39.56 139.52 87.14 72.34 23.44 133.66 36.92 24.73
66,101.59 3,263.70 7,657.23 30,694.40 7,406.90 12,175.55 703.20 3,853.4210,981.12 21,025.45
0.000 276.802 0.000 0.000 0.000 62.690 0.000 0.000 0.000 0.000
0.000 8,212.710 0.000 0.000 0.000 4,534.990 0.000 0.000 0.000 0.000
594.320 0.000 152.190 220.000 85.000 0.000 30.000 28.830 108.670 826.790
45,584.340 0.000 6,020.640 30,694.400 7,406.900 0.000 703.200 3,853.420 4,012.100 20,446.520
267.500 386.802 41.370 0.000 0.000 231.000 0.000 0.000 188.760 23.41020,517.250 11,476.410 1,636.600 0.000 0.000 16,710.540 0.000 0.000 6,969.020 578.930
17.34% 81.67% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
17.34% 81.67% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
410 411 412 413
SOBRECIMIENTO DE HORMIGON CICLOPEO PISO ENLUCIDO FINO MODULO ANAQUEL DE 4 PUESTOS Estructura , cerramientos, quincalleria,sistema eléctrico e iluminación BAJANTE DETUBO PVC e=40, 3" (inc. Abrazaderas) JARDINERAS EN CONTRAFUERTES DE SAN FRANCISCO
m3 m2 Pza ml
8.15 32.6 5 24.5
771.35 31.42 17,716.08 72.49
6,286.50 1,024.29 88,580.40 1,776.01
0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 5,695.550 0.000 0.000 7,516.560 0.000 403.490
7.850 27.546 5.000 24.500 0.000 0.000 6.860 0.800 0.000 16.020 0.000
6,055.100 865.500...