Cooling Tower Inspection Checklist
Tower Location
Date Inspected
Owner / Company
Inspected by
Company Contact
Inspector
Signature
Signature
Owner's Tower Designation
TowerManufacturer
Model No.
Process Served by Tower
Operation:
Design Conditions:
GPM
Cell No.
HW
Number of Fan Cells
ºF
Tower Type:
Serial No.
Continuous q
CWCrossflow q
ºF
Intermittent q
WB
Seasonal q
ºF
Counterflow q
Date Tower was Installed
This checklist is intended to be used as a guide only. This checklist may not cover all potentialissues and should not be relied upon as a substitute for Authorized Service Provider's professional judgment. Authorized Service Provider should report on all issues. Any issues that are identified forwhich a space
is not otherwise provided in the checklist, should be noted in the Other Component sections or in a supplementary document.
Condition: 1—Good
2—Keep an eye on it
1
StructureCasing Material
Structural Material
Fan Deck Material
Stairway q
Ladder
Material
q
Material
Handrail q
Material
Interior Walkway q
Material
Cold Water Basin Material
Silt,Debris Buildup
Water Distribution System
Open Basin System
Distribution Basin Material
Inlet Pipe Material
Inlet Manifold Material
Flow Control Valves
Size
Nozzles — Orifice DiameterSize
Silt, Algae, Debris
Spray Type System
Header Pipe Material
Branch Pipe Material
Nozzles — Orifice Diameter
Up spray q
Down spray q
Heat Transfer System
Fill — Type and MaterialEliminators — Type and Material
Louvers — Type and Material
Biological Fouling
Use this space to list specific items needing attention:
Manual 92-1447D
Size
3—Needs immediate attention
2
3Comments
Condition: 1—Good
2—Keep an eye on it
3—Needs immediate attention
1
2
3
Comments
Mechanical Equipment
Speed Reducer Type:
Belt q
Gear q
Direct Drive q...