FUNDACIONES, S.A. PLAZA LA BOCA CUENTA DE HINCAMIENTO DE PILOTES CUENTA # 1
FECHA: 02-abr-12 NOMBRE: ING. ABDIEL RIVERA CONTRATANTE: FORTALEZA CONSTRUCTIONS, S.A. PROYECTO: PLAZA LA BOCA LOCALIZACION: AVE. JULIO LINARES Y CALLE TRINIDAD Y TOBAGO-ANCON PANAMA DUEÑO: ARQUITECTO: ARQ. GABRIEL KUZNIECKY CALCULO: ING. FIDELDIAZ TORRES ESTUDIOS DE SUELOS: CONTRATO P.U. $ $ $ $ $ 20.00 23.00 34.00 34.00 4,500.00 $ $ $ $ $ EXTRAS P.U. $ $ $ $ 20.00 23.00 34.00 34.00 $ $ $ $ $ CREDITOS P.U. $ $ $ $ 20.00 23.00 34.00 $ $ $ TOTAL EJECUTADO CANTIDAD SUBTOTAL 391.00 1,269.00 2,969.50 80.00 468.50 1.00 $ $ $ $ $ 25,380.00 68,298.50 2,720.00 15,929.00 4,500.00 CEL: CEL: FAX: EMAIL: CONTRATO: 2012.03 COTIZACION: 2012.005ADETALLE PILOTE DE CONCRETO TIPO FUENTES DE 10 PULG PILOTE DE CONCRETO TIPO FUENTES DE 12 PULG PILOTE DE CONCRETO TIPO FUENTES DE 16 PULG PILOTE DE CONCRETO CUADRADO DE 16"X16" MOVILIZACION Y ARMADO DE EQUIPO SUBTOTAL
UNIDAD PIE LINEAL PIE LINEAL PIE LINEAL PIE LINEAL C/U
CANTIDAD 1,080.00 2,800.00 80.00 480.00 1.00
SUBTOTAL 21,600.00 64,400.00 2,720.00 16,320.00 4,500.00
CANTIDAD 189.00169.50 -
SUBTOTAL 3,780.00 3,898.50 -
CANTIDAD 11.50 -
SUBTOTAL
34.00 -$ $
$ 4,500.00
$ 4,500.00
$
109,540.00 109 540 00
$
7,678.50 7 678 50
-$ $
391.00 391 00
$
116,827.50 116 827 50
SUBTOTAL ITBMS SUBTOTAL MENOS ABONO INICIAL 100.00% $ 30,000.00 7%
$ $ $ -$
116,827.50 8,177.93 125,005.43 30,000.00
TOTAL ESTA CUENTA
$
95,005.43ACEPTADO FUNDACIONES, S.A.
ACEPTADO FORTALEZA CONSTRUCTIONS, S.A.
1
Cuenta
RH1203 Plaza La Boca - Cuenta#1
Fuentes 10 plg
FUNDACIONES, S.A. PLAZA LA BOCA RESUMEN DE HINCAMIENTO DE PILOTES FECHA: 02-abr-12 NOMBRE: ING. ABDIEL RIVERA CONTRATANTE: FORTALEZA CONSTRUCTIONS, S.A. PROYECTO: PLAZA LA BOCA LOCALIZACION AVE. JULIO LINARES Y CALLE TRINIDAD Y TOBAGO-ANCON PANAMA DUEÑO: 00-ene-00ARQUITECTO: ARQ. GABRIEL KUZNIECKY CALCULO: ING. FIDEL DIAZ TORRES ESTUDIOS DE SUELOS: 00-ene-00 CONTRATO: 2012.03 COTIZACION: 2012.005A TEL: FAX:
PMAX: DIÁMETRO DE PILOTE FUENTES LONGITUD HINCADA PIES CUENTA # 1 10-mar-12 10-mar-12 10-mar-12 13-mar-12 13-mar-12 13-mar-12 13-mar-12 13-mar-12 10-mar-12 15-mar-12 15-mar-12 15-mar-12 16-mar-12 16-mar-12 16-mar-12 16-mar-12 16-mar-12 16-mar-1216-mar-12 16-mar-12 17-mar-12 19-mar-12 19-mar-12 19-mar-12 19-mar-12 19-mar-12 19-mar-12 20-mar-12 20-mar-12 20-mar-12 21-mar-12 21-mar-12 SUB-TOTAL TOTALES 32.00 1,206.00 1,280.00 2 0 0 15.00 1,269.00 47-1 45 41 51 48 52-1 52-2 53 47-2 43-1 55 43-2 59 61 71-1 71-2 72-1 72-2 73-1 73-2 57 3-1 3-2 4-1 4-2 23 36 71-1 47-2-B 47-2-A 43-2-A 43-2-B 37.50 36.00 36.00 42.50 40.00 37.50 37.00 38.00 39.00 35.5043.00 30.00 40.00 42.00 12.00 40.00 40.00 40.00 44.00 51.50 39.50 36.50 37.00 38.00 38.50 37.00 42.00 38.00 37.00 36.00 32.00 33.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 50.00 35.00 40.00 35.00 40.00 40.00 20.00 40.00 40.00 40.00 40.00 55.00 40.00 40.00 40.00 40.00 45.00 35.00 50.00 40.00 40.00 40.00 35.00 40.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.0010.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 SECCION USADA PIES 10 PULGADAS
PRUEBA
54.50 TON -METR. 18,200.00 LB-PIE CAPACIDAD DINÁMICA TON - METR. 54.50 54.50 54.50 54.50 54.50 54.50 54.50 54.50 54.50 54.50 54.50 54.50 54.50 54.50 54.50 54.50 54.50 54.50 54.50 54.50 54.50 54.50 54.50 54.50 54.50 54.50 54.50 54.50 54.5054.50 54.50 54.50 1,269.00
ENERGIA MARTILLO:
PRETALAD
PILOTE
PUNTA
FECHA
NUMERO PILOTE
RADO
GOLPES / PULGADAS
EXTENSION PIES 3.00 1.00 3.00 2.00 4.00 2.00 -
LARGO A PAGAR PIES 40.00 40.00 40.00 42.50 40.00 40.00 40.00 40.00 40.00 35.50 43.00 30.00 40.00 42.00 15.00 40.00 40.00 40.00 44.00 55.00 40.00 40.00 40.00 40.00 45.00 37.00 50.00 40.00 40.00 40.00 35.00 35.00...