CONSTRUCCION DE UN SALON (AULA)
Aula de 7.40 de ancho por 7.40 de largo = 55.76 m2 Capacidad = 25 alumnos
MATERIAL A USARSE METRADO

PRESUPUESTO
COSTO EN NUEVOS SOLES UNITARIO PARCIAL TOTAL TOTAL UND. CANTIDAD

ESPECIFICACIONES DE LA OBRA
A.- EN 6 ZAPATAS Cemento . Arena: Gravilla: Acero: Sub total = C.- EN 80.00 M2 DE MURO MAS 6 COLUMNAS LADRILLO Cemento . Acero: Arena: Gravilla: Subtotal D.- EN 13.00 M3 DE CONCRETO (CIMIENTOS) Cemento . Hormigon Piedra Sub total =

Bolsas M³ M³ varillas

18.00 7.50 10.00 12.00

18.50 24.00 26.00 34.00

333.00 180.00 260.00 408.00 1,181.00 480.00 888.00 612.00 240.00 130.00 2,350.00 851.00 420.00 200.00 1,471.00 962.00 450.00 192.00 247.00 1430.00 343.40 3,624.40 444.00 36.00 52.00 646.00 265.00 1,443.00 120.00 414.40 240.00 600.00310.40 780.64 2465.44

Millar Bolsas varillas M³ M³

6.00 48.00 18.00 10.00 5.00

80.00 18.50 34.00 24.00 26.00

Bolsas M³ M³

46.00 20.00 10.00

18.50 21.00 20.00

E.- 64.64 M2 DE LOSA ALIGERADA MAS VOLADIZO (TECHO) Cemento . Ladrillo de techo Arena: Gravilla: Acero: Acero: Sub total = F.- 25.80 ML. DE VIGAS COLGANTES EN LOZA ALIGERADA Cemento . Arena: Gravilla: Acero: Acero: Sub total =G.- MANO DE OBRA EXCAVACION Y LLENADO DE ZAPATAS EXCAVACION Y LLENADO DE CIMIENTOS PARADO Y LLENADO DE COLUMNAS ASENTADO DE LADRILLO ENCOFRADO Y LLENADO DE VIGAS COLGANTES ENCOFRADO Y LLENADO DE TECHO ALIGERADO

Bolsas Millar M³ M³ varillas Alambron

52.00 600.00 8.00 9.50 55.00 132.08

18.50 0.75 24.00 26.00 26.00 2.60

Bolsas M³ M³ varillas Alambron

24.00 1.50 2.00 19.00 101.9218.50 24.00 26.00 34.00 2.60

UND. ML UND. Millar ML. M²

6.00 29.60 6.00 100.00 25.80 64.65

20.00 14.00 40.00 6.00 12.03

TOTAL GENERAL

12,534.84

ACAVADOS EN LA IGLESIA
Auditorio de 12.15 x 5.50 = 67.00 m2 Capacidad = 110 hermanos La iglesia esta dividido en tres zonas Zona I el auditorio Zona II Educacion Zona III otros ambientes
MATERIAL A USARSE METRADO

PRESUPUESTO
UND.CANTIDAD COSTO EN NUEVOS SOLES PARCIAL UNITARIO TOTAL TOTAL

ESPECIFICACIONES DE LA OBRA

PISOS
ZONA I 67.00 ZONA II 41.95 TOTAL PARA CONSTRUIR 108.95 M2 CEMENTO ARENA GRUESA HORMIGON OCRE DE COLOR ROJO SUB TOTAL
Bolsas M³ M³ KILOS 19.00 2.75 EXISTE 4.00 11.00 18.50 24.00 351.50 66.00 0.00 44.00 461.50

TARRAJEOS
ZONA I 89.40 M2 ZONA II 79.20 M2 TOTAL PARA TARRAJEOS 168.60 CEMENTO ARENA FINASUB TOTAL 6 COLUMNAS Y 6 ZAPATAS ARENA GRUESA GRAVILLA CEMENTO ACERO SUB TOTAL
M³ M³ Bolsas VARILLA 1.02 1.27 18.00 18.00 24.00 26.00 18.50 24.50 Bolsas M³ 18.00 3.09 18.50 24.00 333.00 74.16 407.16

24.48 33.02 333.00 441.00 831.50

TOTALES
MANO DE OBRA PISOS TARRAJEOS COLUMNAS TERMINADAS
M2 M2 UD 108.95 170.50 6.00 2.00 2.00 35.00 217.90 341.00 210.00 768.90

1,700.16

768.90TOTAL GENERAL

2,469.06

CONSTRUCCION DE 2 BAÑOS (SS.HH.)
SS.HH. 01 DE NIÑOS Y 01 DE NIÑAS DE 1.00 X1.80 AREA 1.8 M2
MATERIAL A USARSE

PRESUPUESTO
METRADO
UND. CANTIDAD UNITARIO

ESPECIFICACIONES DE LA OBRA

COSTO EN NUEVOS SOLES
PARCIAL TOTAL TOTAL

LADRILLO DE CEMENTO CEMENTO ARENA GRUESA PISO PULIDO SANITARIOS

MILLAR 15.00 M3 1.80 UD

200.00 15.00 2.00 1.80 2.00 1.80 83.501.00

0.45 18.50 24.00 60.00 175.00 135.00 1.00 150.00

90.00 277.50 48.00 108.00 350.00 243.00 83.50 150.00

M2 LOSA DE CONCRETO ESTIMADO INSTALACIONES SANITARIAS MANO DE OBRA POR BAÑO TERMINADO

TOTAL

1,200.00 150.00 1,350.00

LA CONSTRUCCION DE 2 BAÑOS SERIAN

2,700.00 NUEVOS SOLES

CONSTRUCCION DE UN SALON (AULA) CONSTRUCCION TIPICO DE LA CIUDAD ADOBE , BARRO Y PIEDRA
Aula de6.40 de ancho por 5.40 de largo = 34.56 m2 Capacidad = 25 alumnos
MATERIAL A USARSE

PRESUPUESTO
METRADO UND. CANTIDAD COSTO EN NUEVOS SOLES UNITARIO PARCIAL TOTAL TOTAL

ESPECIFICACIONES DE LA OBRA LADRILLO CRUDO ARTESANAL CEMENTO PARA DINTELES CEMENTO, CAL, ARENA Y TARRAGEO BASE DE PIEDRACON CEMENTO ACENTADO DE ADOBE CON BARRO 4 VENTANAS DE FIERRO 1 PUERTA ETERNIT GRIS MAS VIGAS DE...
Leer documento completo

Regístrate para leer el documento completo.

Estos documentos también te pueden resultar útiles

  • Ing. civil
  • Ing Civil
  • Ing Civil
  • Ing. Civil
  • ing civil
  • ing civil
  • ing civil
  • ing. civil

Conviértase en miembro formal de Buenas Tareas

INSCRÍBETE - ES GRATIS