Ing Electrico

Páginas: 7 (1672 palabras) Publicado: 19 de febrero de 2013
Eaton’s Enclosed Meter Family

Single and Multi Unit Enclosed Meters
The Eaton® Enclosed Meter line provides a complete energy metering and data acquisition solution in a single enclosure. Designed for Eaton’s IQ 35M, IQ 150, IQ 250/260, and Power Xpert® 2000 Meters, Eaton’s Enclosed Meter line offers mounting and installation flexibility, especially in retrofit applications where no meteringcompartment or mounting space is available in the existing electrical distribution equipment or where installation time is a premium. Factory designed and wired, Eaton’s Enclosed Meter line offers savings in labor and installation costs since input current and voltage wiring as well as I/O wiring is pre-wired to terminal blocks inside the enclosure. The Enclosed Meter line has two offerings;Single, prewired unit (Specific IQ 150, IQ 250/260, or PXM 2000 models) and a Multi unit (Specific IQ 150, IQ 250/260, or IQ 35M models). Because the Multi unit automatically includes Eaton’s Power Xpert Gateway 200E, it facilitates measurement and verification of the energy usage on processes and in buildings. This provides a convenient way to monitor energy usage from multiple points, collect and logspecific energy use parameters, and display and generate logs for historical energy usage reports. Simply put, Eaton’s Multi unit enclosed meter solution helps meet any measurement and verification requirement to show energy efficiency improvements and results.
Multi Unit, NEMA 12 front view

Applications Factory designed and wired to fit various Eaton power and energy meters at varying pricepoints, Eaton’s Enclosed Meter line offers savings in labor and installation costs since input current and voltage wiring, as well as I/O wiring, is pre-wired to terminal blocks inside the enclosure. Stand-alone, enclosed meters are ideal for new metering applications where no metering existed previously, retrofit installations where energy monitoring is a must or where ease of installation isrequired
• •

Features/benefits


Saves installation time and cost One part number to order; no need to worry that any part has been left out Pick the meter or meters you need as it is designed to fit various Eaton power and energy meters, at varying price points





Factory wired Most electrical contractors are very familiar with wiring meters. However, it does take time to place thedisconnect, CT shorting blocks, terminal blocks, control power transformer, etc. and associated wiring. It is not uncommon for errors to be introduced during the installation of multiple meters; it's just inherent in wiring. With Eaton’s Enclosed Meter line, everything is wired at the factory: the shorting block, terminal blocks, etc., assuring that it’s done right. Further, to ensure safety,Eaton’s Enclosed Meter line includes a primary fusible disconnect for line voltage that can be turned off during meter maintenance For applications with line voltages above the rated power supply of the meter, an optional control power transformer is supplied in the enclosure. Control voltage can also be supplied via a separate source that is wired to the field installation terminal block. CT inputsfor the meter are wired directly to shorting terminal blocks for easy field installation. Factory wired products also save on installation time and costs. The meters are flush mounted on the enclosure door with all inputs/outputs factory-wired to terminal blocks.

Healthcare facilities Educational facilities and campuses Industrial facilities Commercial facilities Government facilities

SingleUnit, NEMA 12 front view

• • •

The Multi unit offering consolidates energy related data available from the meters in the enclosure, but also allows for external meters to be added to the embedded Power Xpert Gateway 200E. Through the Power Xpert Gateway 200E’s embedded web server, information can be presented in in a variety of ways, a standard Web browser being the most widely used...
Leer documento completo

Regístrate para leer el documento completo.

Estos documentos también te pueden resultar útiles

  • Ing electrica
  • Ing Electrica
  • Ing. Electr.
  • Ing. Electrico
  • ing electrico
  • ing. electrica
  • ing electrica
  • ing electrica

Conviértase en miembro formal de Buenas Tareas

INSCRÍBETE - ES GRATIS