Ingeniero
Project Fénix Power Project Revision Date: Jan-06-2012
SUBMITTED FOR :
1
Contractor’s Aproval Name: Andrioli Luciano
RA (Review)
¢
2 INF (Information)
3 VF(Final)
Contractor Doc. No: SNC Doc. No: Document Title: VDR Codes
3563- W-WP-000102 69107010-M14-0023 Welding Procedure Specification Structure Welding Single-V-groove weld & Butt Joint M14A REV.
01/06/12 DATE
ISSUED FOR APPROVAL DESCRIPTION
INE PREPARED
AIU REVIEWED BY
ALU APPROVED BY
S1 WORK MAY PROCEED S2 REVISE AND RESUBMIT. WORK MAY PROCEED. SUBJECT TO RESOLUTIONOF INDICATED COMMENTS S3 REVISE AND RESUBMIT. WORK MAY NOT PROCEED S4 REVIEW NOT REQUIRED OR FOR INFORMATION S5 AS BUILT CERTIFIED S6 CANCELLED
Contractor's drawing review for conformity withspecifications and design drawing This review does not relieve the vendor of his responsibility for errors in design and detailing as detailed in his contract. Contractor No: Doc. Title:3653-W-WP-000102 Welding Procedure Specification Structure Welding Single-V-groove weld & Butt Joint
SNC Doc. No.
Rev.: VDR. Codes
A
Date received:
M14
Reviewed by:
Project: 0691 FENIX POWERPROJECT Submittal
Date:
69107010-M14-0023 Total Number of Pages Including Front Sheet: _05_
01
69107010 TECHINT S.A.C
Project Fénix Power Project Revision Date: Jan-06-2012 Contractor’sAproval Name: Andrioli Luciano
REVISION CONTROL SHEET
Rev. No. Section(s) / Page(s) Details of revision
A
REV.
ISSUED FOR APPROVAL
DESCRIPTION
06-01-2012
DATE
INE
ISSUED
AIUCONTROLLED
ALU
APPROVED
FENIX POWER PROJECT ABOVE GROUND MECHANICAL
ENGINEERING
Welding Procedure Specification Structure Welding Single - V - grove Weld & Butt Joint
WELDING PROCEDURESPECIFICATION
ESTE DOCUMENTO ES PROPIEDAD DE TECHINT COMPAÑIA TÉCNICA INTERNACIONAL Y NO ESTÁ PERMITIDO SU DIFUSIÓN, COPIA O MODIFICACIÓN SIN UNA PREVIA AUTORIZACIÓN ESCRITA.
Documento N°:...