PAVIMENTO ECONOMICO CALLE EMILIANO ZAPATA SUB-RASANTE DESGLOSE DE OPERACIONES
EXISTENTE PROYECTO
CAD LOTE IZQ. CENTRO DER. LOTE IZQ. CENTRO DER. IZQ. CENTRO DER. IZQ. CENTRO DER. PROM. ANCHO AREA (a1+a2)/2 DIST. VOL. (M3)
0+000 99.46 99.54 99.53 99.58 99.60 99.58 99.43 99.45 99.43 -0.15 -0.15 -0.15 -0.15 8.50 -1.28
20 99.58 99.60 99.51 99.5899.64 99.58 99.43 99.49 99.43 -0.15 -0.11 -0.08 -0.11 8.50 -0.96 -1.12 20.00 -22.40
40 99.59 99.64 99.58 99.58 99.68 99.58 99.43 99.53 99.43 -0.16 -0.11 -0.15 -0.14 8.50 -1.19 -1.08 20.00 -21.60
60 99.62 99.67 99.57 99.62 99.72 99.62 99.47 99.57 99.47 -0.15 -0.10 -0.10 -0.12 8.50 -0.99 -1.09 20.00 -21.80
80 99.57 99.62 99.53 99.66 99.76 99.66 99.51 99.61 99.51-0.06 -0.01 -0.02 -0.03 8.50 -0.26 -0.63 20.00 -12.60
100 99.57 99.63 99.59 99.64 99.74 99.64 99.49 99.59 99.49 -0.08 -0.04 -0.10 -0.07 8.50 -0.62 -0.44 20.00 -8.80
120 99.57 99.56 99.50 99.62 99.72 99.62 99.47 99.57 99.47 -0.10 0.01 -0.03 -0.04 8.50 -0.34 -0.48 20.00 -9.60
140 99.52 99.53 99.48 99.60 99.70 99.60 99.45 99.55 99.45 -0.07 0.02 -0.03 -0.03 8.50-0.23 -0.29 20.00 -5.80
160 99.53 99.48 99.51 99.56 99.68 99.56 99.41 99.53 99.41 -0.12 0.05 -0.10 -0.06 8.50 -0.48 -0.36 20.00 -7.20
165.75 99.63 99.63 99.52 99.60 99.66 99.60 99.45 99.51 99.45 -0.18 -0.12 -0.07 -0.12 8.50 -1.05 -0.77 15.75 -12.13
TOTAL -121.93
B. N. 1= 100.00 UBICADO EN POSTE CFE #295998 CADENAMIENTO 0+107.85 CUNETA SURLEVANTAMIENTO REALIZADO DE CALLE 27 ENERO A CALLE 5 DE MAYO
PAVIMENTO ECONOMICO AV. 27 DE ENERO SUB-RASANTE DESGLOSE DE OPERACIONES
EXISTENTE PROYECTO
CAD LOTE IZQ. CENTRO DER. LOTE IZQ. CENTRO DER. IZQ. CENTRO DER. IZQ. CENTRO DER. PROM. ANCHO AREA (a1+a2)/2 DIST. VOL. (M3)
0+000 99.78 99.80 99.81 99.78 99.80 99.81 99.6399.65 99.66 -0.15 -0.15 -0.15 -0.15 8.50 -1.28
20 99.35 99.41 99.39 99.68 99.74 99.68 99.53 99.59 99.53 0.18 0.18 0.14 0.17 8.50 1.42 0.07 20.00 1.40
40 99.43 99.46 99.38 99.60 99.72 99.60 99.45 99.57 99.45 0.02 0.11 0.07 0.07 8.50 0.57 1.00 20.00 20.00
60 99.44 99.46 99.45 99.58 99.70 99.58 99.43 99.55 99.43 -0.01 0.09 -0.02 0.02 8.50 0.17 0.37 20.00 7.4080 99.52 99.51 99.43 99.56 99.68 99.56 99.41 99.53 99.41 -0.11 0.02 -0.02 -0.04 8.50 -0.31 -0.07 20.00 -1.40
100 99.56 99.59 99.53 99.54 99.66 99.54 99.39 99.51 99.39 -0.17 -0.08 -0.14 -0.13 8.50 -1.11 -0.71 20.00 -14.20
107.85 99.55 99.56 99.58 99.58 99.64 99.58 99.43 99.49 99.43 -0.12 -0.07 -0.15 -0.11 8.50 -0.96 -1.04 7.85 -8.16
TOTAL5.04
B. N. 2= 99.88 UBICADO EN POSTE CFE #345189 CADENAMIENTO 0+005.40 CUNETA SUR
LEVANTAMIENTO REALIZADO DE PAVIMENTO EXISTENTE A CALLE EMILIANO ZAPATA
PAVIMENTO ECONOMICO AV. 27 DE ENERO SUB-RASANTE DESGLOSE DE OPERACIONES
EXISTENTE PROYECTO
CAD LOTE IZQ. CENTRO DER. LOTE IZQ. CENTRO DER. IZQ. CENTRO DER. IZQ. CENTRODER. PROM. ANCHO AREA (a1+a2)/2 DIST. VOL. (M3)
0+000 99.81 99.78 99.79 99.81 99.78 99.79 99.66 99.63 99.64 -0.15 -0.15 -0.15 -0.15 8.50 -1.28
20 99.21 99.26 99.21 99.55 99.63 99.55 99.40 99.48 99.40 0.19 0.22 0.19 0.20 8.50 1.70 0.21 20.00 4.20
40 99.08 99.18 99.13 99.38 99.51 99.38 99.23 99.36 99.23 0.15 0.18 0.10 0.14 8.50 1.22 1.46 20.00 29.20
60 99.0899.10 99.10 99.27 99.40 99.27 99.12 99.25 99.12 0.04 0.15 0.02 0.07 8.50 0.60 0.91 20.00 18.20
80 99.01 99.11 99.08 99.19 99.32 99.19 99.04 99.17 99.04 0.03 0.06 -0.04 0.02 8.50 0.14 0.37 20.00 7.40
100 99.06 99.11 99.01 99.13 99.26 99.13 98.98 99.11 98.98 -0.08 0.00 -0.03 -0.04 8.50 -0.31 -0.09 20.00 -1.80
106.55 99.08 99.16 99.13 99.12 99.22 99.12 98.97 99.07...
Leer documento completo

Regístrate para leer el documento completo.

Estos documentos también te pueden resultar útiles

  • Ingeniero
  • Ingeniero
  • Ingeniero
  • Ingeniero
  • Ingeniero
  • Ingeniero
  • Ingeniero
  • Ingeniero

Conviértase en miembro formal de Buenas Tareas

INSCRÍBETE - ES GRATIS