STEP 0
Manufacturing Academy
WCM FGA&GROUP Uso interno 04a_AM_Step0_UK_080904 TrP
Autonomous Maintenance activity planning diagram
DEFINITION OF APPLICATION PLAN
IDENTIFICATION OF OPERATING ACTIVITIES ESTIMATE OF TIMES AND RESPONSIBILITIES
DEFINITION OF ACTIVITY DEVELOPMENT TIME HYPOTHESES DEFINITION OF RESPONSIBILITIES IN CARRYING OUT THE ACTIVITIESPREPARATION OF EQUIPMENT AND MATERIALS
TECHNICAL DIAGRAMS OF THE SELECTED PLANTS AM TAGS CLEANING EQUIPMENT ACTIVITY BOARD ACCIDENT PREVENTION
SCHEDULING
FORMALIZATION OF ACTION DEFINITION OF PERSONS INVOLVED AND DETAILED METHODS OF OPERATION APPLICATION OF VISUAL MANAGEMENT OF ACTIVITIES
DEFINITION OF CRITICAL AREAS, OBJECTIVES AND PRIORITIES OF THE WORK SITES COLLECTION/ANALYSIS OF DATAREGARDING CONDITIONS AND USE OF PLANTS BREAKDOWN OF ACTIVITIES/TASKS INTO SELECTED AREAS DEFINITION OF ACTIONS n WITH PLANT STOPPED n WITH PLANT OPERATING n EXTERNAL
WCM FGA&GROUP
Uso interno
04a_AM_Step0_UK_080904
TrP
Definition of result indicators
E
E PL M XA
IDENTIFICATION OF OPERATING ACTIVITIES
actual
FAULTS FAULT RATE LINE STOPPAGE TIME OEE PRODUCTIVITY RE-WORKINGOR REJECTS DUE TO QUALITY ENERGY CONSUMPTION SUGGESTIONS ACCIDENTS ON THE JOB17
WCM FGA&GROUP
objectives
less than 1 / month less than 0.1 / 100 hours less than 4 hours/month more than 95% more than 169 % less than 0.1 % 70 6 / year/employee 0 / year
10 / month 1.03 / 100 hours 58 hours/month 80.8 % 113 % 1.7 % 100 1/ year/employee 4 / year
Uso interno
04a_AM_Step0_UK_080904
TrPBreakdown of activities/tasks
MODEL SECTOR SELECTION (Area/Section/BTU) ASSIGNMENT OF SECTORS TO TEAMS DEFINITION OF SITE MANAGER ASSIGNMENT OF TASKS TO TEAM MEMBERS
IDENTIFICATION OF OPERATING ACTIVITIES
A1
A2
B1
B2
C
The Team must include ALL persons who work in the area plus any external resources (e.g. Technologists, Maintenance engineers, Logistics, etc.). The TeamLeader must be one of the persons of the Production structure (from Production manager for the pilot sites to the Team Leader for deployment of the pillar on stream)
WCM FGA&GROUP Uso interno 04a_AM_Step0_UK_080904 TrP
Breakdown of activities/tasks
IDENTIFICATION OF OPERATING ACTIVITIES
ANALYSIS OF ANALYSIS OF LAYOUT LAYOUT AND MACHINERY AND MACHINERY
STARTING FROM THE LAYOUT OF THEWORKSHOP AND PLANT CHARACTERISTICS, AN ANALYSIS IS MADE OF POSSIBLE ACTIVITIES TO BE CARRIED OUT AND THE SCOPE OF THE ACTIONS ESTABLISHED
CLASSIFICATION OF CLASSIFICATION OF MACHINERY MACHINERY
IT IS IMPORTANT TO HAVE IT IS IMPORTANT TO HAVE FIRST OF ALL CLASSIFIED THE FIRST OF ALL CLASSIFIED THE MACHINERY IN CLASSES AA - -AA MACHINERY IN CLASSES AA -B-C -B-C (see PM manual) (see PM manual)Autonomous Maintenance activities will regard mainly class AA and A machines, with gradual extension to class B and possibly C (at least for the first 3 steps).
WCM FGA&GROUP Uso interno 04a_AM_Step0_UK_080904 TrP
Definition of actions
IDENTIFICATION OF OPERATING ACTIVITIES
ACCORDING TO: ACCORDING TO:
n n n n n n n n n n n n n n
ACTIONS WITH PLANT STOPPED
TYPE OF MACHINERY TYPE OFMACHINERY ACCESSIBILITY OF THE AREAS ACCESSIBILITY OF THE AREAS SAFETY RULES SAFETY RULES PRODUCTION CONSTRAINTS PRODUCTION CONSTRAINTS CALIBRATION/ADJUSTMENT REQUIREMENTS CALIBRATION/ADJUSTMENT REQUIREMENTS COMPONENT CHARACTERISTICS COMPONENT CHARACTERISTICS AVAILABILITY OF RESOURCES AVAILABILITY OF RESOURCES
ACTIONS WITH PLANT OPERATING
MAJOR INTERVENTIONS
ANY CRITICAL POINTSRESPONSIBILITY OF MAINTENANCE
WCM FGA&GROUP Uso interno 04a_AM_Step0_UK_080904 TrP
Criteria for selecting sector/model
IDENTIFICATION OF OPERATING ACTIVITIES
INSIDE THE PRODUCTION UNIT, IDENTIFY A SECTION OF PROCESS LARGE ENOUGH TO GUARANTEE THAT: IT REPRESENTS A MAJOR CRITICAL POINT OF OF THE PRODUCTION PROCESS (Class AA or A). THE MEMBERS OF THE TEAM DO NOT OBSTRUCT EACH OTHER DURING ACTIONS...