Metodologia rup
Test Evaluation Summary
Version <1.0>
[Note: The following template is provided for use with the Rational Unified Process. Text enclosed in square brackets anddisplayed in blue italics (style=InfoBlue) is included to provide guidance to the author and should be deleted before publishing the document. A paragraph entered following this style willautomatically be set to normal (style=Body Text).]
Revision History
Date | Version | Description | Author |
<dd/mmm/yy> | <x.x> | <details> | <name> |
| | | |
| | | |
| | | |
Table of Contents
1. Introduction
1.1 Purpose
1.2 Scope
1.3 Definitions, Acronyms and Abbreviations
1.4 References
1.5 Overview 2. Test Results Summary
3. Requirements-based Test Coverage
4. Code-based Coverage
5. Suggested Actions
6. Diagrams
Test Evaluation Summary
1. Introduction
[The introduction of the Test Evaluation Summary should provide an overview of the entire document. It should include the purpose, scope, definitions, acronyms, abbreviations, references,and overview of this Test Evaluation Summary.]
1.1 Purpose
[Specify the purpose of this Test Evaluation Summary.]
1.2 Scope
[A brief description of the scope of thisTest Evaluation Summary; what Project(s) it is associated with, and anything else that is affected or influenced by this document.]
1.3 Definitions, Acronyms and Abbreviations
[Thissubsection should provide the definitions of all terms, acronyms, and abbreviations required to properly interpret the Test Evaluation Summary. This information may be provided by reference to theproject Glossary.]
1.4 References
[This subsection should provide a complete list of all documents referenced elsewhere in the Test Evaluation Summary. Each document should be identified...
Regístrate para leer el documento completo.