Peak Lean Project

Páginas: 4 (875 palabras) Publicado: 27 de octubre de 2011
Peak
 LAN
 Project
 
 


 

 


 


 

Octubre
 21,
 2011
 

Collaborative
 assignment
 to
 be
 performed
 in
 classroom
 Fernando
 Cortés
 Campos
 617783
  Abraham
 Mendoza
 798810
  José
 Antonio
 Ordaz
 Manrique
 807249
 
 
 
  Peak
 Systems
 is
 a
 small information
 Systems
 Consulting
 firm
 located
 Meridian,
  Louisiana.
 Peak
 has
 just
 been
 hired
 to
 design
 and
 install
 a
 local
 area network
 (LAN)
  for
 the
 city
 of
 Meridians
 social
 welfare
 agency.
 You
 are
 the
 manager
 for
 the
 project,
  which
 includes
 one
 Peak professional
 and
 two
 interns
 from
 a
 local
 university.
 You
  have
 just
 finished
 a
 preliminary
 scope
 statement
 for
 the
 project (see
 below).
 You
  are
 now
 brainstorming
 potential
 risks
 associated
 with
 the
 project.
 
  1. Identify
 potential
 risks
 associated with
 this
 project.
 Try
 to
 come
 up
 with
  at
 least
 five
 different
 risks.
 
  -­‐Un
 riesgo
 se
 puede
 presentar
 en
 alguna
 de las
 20
 estaciones
 de
 trabajo
  no
 funcione
 su
 tarjeta
 interna
 de
 red,
 esto
 podría
 impactar
 en
 precio
 y
  tiempo
 para el
 proyecto
  -­‐Algunos
 discos
 duros
 de
 las
 estaciones
 de
 trabajo
 o
 Laptop,
 tengan
  sectores
 corruptos
 y
 por
 lo
 tanto
 obliguen a
 cambiar
 el
 disco
 duro
 o
  reinstalar
 el
 sistema
 operativo.
  -­‐La
 infraestructura
 prevista
 no
 soporte
 la
 conectividad
 de...
Leer documento completo

Regístrate para leer el documento completo.

Estos documentos también te pueden resultar útiles

  • Lean project
  • Lean
  • No lo lean.
  • lean
  • no lean esto
  • No lo lean
  • Lean
  • Lean

Conviértase en miembro formal de Buenas Tareas

INSCRÍBETE - ES GRATIS