A. The Planning Phase
In order todefine the scope of a project and to identify potential problem areas the development of any computer based information system must be carefully (1)………….… The planning phase normally follows a sequenceof steps including recognising the (2)………….….. , setting project (3)………….….. , conducting (4)………….… studies and establishing control mechanisms.
B. The Analysis Phase
During the AnalysisPhase of the SDLC existing systems are studied with the aim of designing a new or improved system. Steps involved in this phase include (1)..…….……….. the project, creating a (2)..…….……….. team, defining(3)..………….….. needs, defining system (4)..…….………..criteria and creating a design (5)..………….…... . At the conclusion of this phase a decision must be made as to whether or not the project will(6)..……….……..
C. The Design Phase
During the design phase the (1)..………….. and (2)..………….. required by the new system are defined. During this phase it is important that a number of different (3)..……….……..are investigated to ensure that the most efficient and effective (4)..……….…….. is adopted. Part of the design phase involves preparing an (5)..……….…….. proposal.
D. The Implementation Phase
Inthe implementation phase physical and conceptual (1)..……….…….. required for the project are obtained. Some of the steps in this phase include preparing the (2)..……….…….. facilities, (3) ..…….………..the users/participants and (4)..……….…….. over to the new system.
E. The Use/Evaluation Phase
Once the system has been (1)..……….…….. the final phase in the project is the Use/Evaluation phase.During this phase the system should be in full use and meeting the (2)..……….…….. that were set during the (3)..……….…….. phase. This phase has a number of steps including using the (4) ..……….…….....