SURVEY REPORT

-------------------------------------------------

-------------------------------------------------
Date: October 12th, 2011 Survey Number: 034-11 V
-------------------------------------------------

-------------------------------------------------
M/V “SEABORD AMERICA” V.007 SB
-------------------------------------------------
Places: TPG – Inarpi’s Port TerminalThis is to certify that the undersigned surveyor from VERIFICADORES ECUATORIANOS S.A. “VERIFECSA”, according to the instructions received from ECUAPANDI S.A., local Correspondents of CONOSUR – COMPAÑIA DE SEGUROS Y RE-ASEGUROS, carried out a survey to a Harvester Machine discharged from M/V “SEABORD AMERICA” V.007 SB, on August 17th 2011


1. SCOPE OF THE SURVEY

This survey wasrequested by INARPI S.A. with the purpose to ascertain in the condition of a Harvester Machine consigned to Mr. OTTO HAON PIEDRAITA, same that suffered an accident during discharging operation carried out at TPG’s Port Terminal of Guayaquil

2. PRESENT AND IN ATTENDANCE :
(TPG / INARPI’s – Module Nº 1)

- Mr. Otto Haon Piedrahita Consignee
- Miss. Dayana Avila Inarpi’s ClaimDepartment
representative
- Mr. Tomas Moreno Inarpi’s Representative
- Mr. Giovanni Mendieta Surveyor from VERIFECSA

Page # 2
Report # 034-11 V
M/V “SEABOAD AMERICA” V.007 SB

3. Chronology

* August 21st , 2011
The attending surveyor was present at TPG-INARPI’s premises – Module # 1, in order to establish the cause and extension of damages caused to the harvester machinefrom 09:30 hrs until 10:30

* August 23rd - 24th , 2011
The attending surveyor was present at TPG-INARPI’s premises – Module # 1, during the mobilization process from 17:00 hrs until 18:00 hrs & from 09:00 until 12:30 hours respectively

* August 30th, 2011
The attending surveyor was present at TPG-INARPI’s premises – Module # 1, during the mobilization process from 09:30hrs until 16:00 hrs.

4. PARTICULARS OF THE BILL OF LADING

The particulars corresponding to the above mentioned containers were taken from the Bill of Lading # SMLU2825370A, supplied by port operator, Inarpi:

Shipper : NAIS EQUITMENT AND
CONSULTING INC.
Miami, Florida - U.S.A.
Consignee: OTTO TOMAS HAON PIEDRAHITA
Los Rios, Ecuador
Notify Party : Same as above
Port of Loading : Houston, Texas
Port of Discharge : Puerto Bolívar, Ecuador
Description : Case Combine Mod. 2966
Color: Red / Year: 2000
D/R 177721
Quantity : 1 Unit
Weight : 23000.00 L /10432.00 Kg



Page # 3
Report # 034-11 V
M/V“SEABOAD AMERICA” V.007 SB

5. PRECEDENTS

As per information obtained during our survey, on 17th August, 2011 at approximately 20:40 hours during the unloading operations carried out at the port terminal of Guayaquil - TPG, the above described machine, with D/R # 1777 suffered damages in its lower rear structure, apparently caused due to an apparently bad maneuver carried out by the crane´soperator and/or failure of the lashing devices, used during the discharging operation , same that caused the collapse of the structure, when the machine was being discharged at the pier and approximately from 2 meters high abruptly fell to the ground.

6. FINDINGS

As per instructions received from INARPI S.A., through ECUAPANDI S.A., P & I Local Correspondents of Conosur-Compañia deSeguros y Reaseguros – Chile, on 21st August, 2011, at approximately 09:15 hours, a delegate of our company attended at TPG/Inarpi, Module # 1.

The harvester machine was found to be temporarily placed at the central access to the piers. Several wooden pieces were placed underneath of it to support the rear section of the lower structure of the machinery. The following structural damages...
Leer documento completo

Regístrate para leer el documento completo.

Estos documentos también te pueden resultar útiles

  • qqqq
  • Qqqq
  • Qqqq
  • Qqqq
  • qqqq
  • qqqq
  • Qqqq
  • qqqq

Conviértase en miembro formal de Buenas Tareas

INSCRÍBETE - ES GRATIS