Tutorial of JWG-B2/B4/C1.17 on HVDC Transmission Systems –
Design and Economics
Converter Configurations – John Graham, ABB Brasil
john.graham@br.abb.com
STUDY COMMITTEE B2, JWG B2-17/B4/C1
HVDC Transmission Configurations and Intermediate Stations
Converter Configurations : IntroductionTo start discussing converter configurations we
need to consider:
1. Line configuration, bipolar or monopolar
2. Transmitted power and voltage
3. Location, especially regarding transportation
While many configurations are possible, we discuss in detail
only those applicable to overhead line transmission.
STUDY COMMITTEE B2, JWG B2-17/B4/C1
HVDC Transmission Configurations andIntermediate Stations
Cigré Technical Brochure 186 from WG 14.20 - 2001
STUDY COMMITTEE B2, JWG B2-17/B4/C1
HVDC Transmission Configurations and Intermediate Stations
Id
Pd
Ud
In all CSC cases, bi-polar operation only considered,
except in emergency or maintenance.
STUDY COMMITTEE B2, JWG B2-17/B4/C1
HVDC Transmission Configurations and Intermediate Stations
Bipole
MonopoleBack-to Back
In all CSC cases, 12-pulse converters only considered
HVDC Classic
HVDC CCC
HVDC VSC
STUDY COMMITTEE B2, JWG B2-17/B4/C1
HVDC Transmission Configurations and Intermediate Stations
Bipole
Monopole
12-pulse centre-tap
In all CSC cases, bi-polar operation only considered,
except in emergency or maintenance.
Figure 3.2.a Ground Return
Figure 3.2.bMetallic Return
STUDY COMMITTEE B2, JWG B2-17/B4/C1
HVDC Transmission Configurations and Intermediate Stations
Basic types of Converters
• Naturally commutated converters (Thyristors)
(current source converters : CSCs)
– Classic HVDC Transmission
Itaipu, Three Gorges, Baltic Cable, (many)
– Capacitor Commutated Converters (CCC)
Garabi, Rapid City
• Voltage source converters (VSCs)– HVDC Light, HVDC Plus (IGBT)
Cross Sound, Murray Link, Troll A
– VSC using GTO (statcom or industrial)
STUDY COMMITTEE B2, JWG B2-17/B4/C1
HVDC Transmission Configurations and Intermediate Stations
1990
1992
1994
1996
1998
2000
2002
2004
2006
Rihand-Delhi
HQ-NEH
New Zealand
Skagerrak III
Baltic Cable
Kontek
Chandrapur-Padghe
Leyte-Luzon
SwePolGotland Light
Tjæreborg
Directlink
Garabi I
Italy-Greece
Three Gorges-Changzhou
Garabi II
Cross Sound Cable
Murraylink
Three Gorges-Guangdong
Rapid City Tie
Sylmar
Troll A
Vizag II
Three Gorges-Shanghai
NorNed
EstLink
Valhall
Sharyland
Sapei
Outaouais
Nord E.on 1
Caprivi Link
Xiangjiaba-Shanghai
Recent ABB projects
VSC overhead
300 MW, 350 kV
2008
2010
2012HVDC
HVDC Light
HVDC CCC
CSC overhead
6400 MW, 800 kV
STUDY COMMITTEE B2, JWG B2-17/B4/C1
HVDC Transmission Configurations and Intermediate Stations
STUDY COMMITTEE B2, JWG B2-17/B4/C1
HVDC Transmission Configurations and Intermediate Stations
Investment Cost
Losses
Availability
+
-
STUDY COMMITTEE B2, JWG B2-17/B4/C1
HVDC Transmission Configurations and IntermediateStations
Availability
Losses
Investment Cost
+
+
o
STUDY COMMITTEE B2, JWG B2-17/B4/C1
HVDC Transmission Configurations and Intermediate Stations
Phase 1
Phase 2
Investment Cost
Losses Phase 1
Availabity Phase 1
+
-
STUDY COMMITTEE B2, JWG B2-17/B4/C1
HVDC Transmission Configurations and Intermediate Stations
Phase 2
Investment Cost
Losses
Availabity
Phase1
+
-
STUDY COMMITTEE B2, JWG B2-17/B4/C1
HVDC Transmission Configurations and Intermediate Stations
Phase 2
Investment Cost
Losses
Availabity
Phase 1
+
+
STUDY COMMITTEE B2, JWG B2-17/B4/C1
HVDC Transmission Configurations and Intermediate Stations
Phase 1
Initial rating ?
Phase 2
Investment Cost: line/stations
Losses
Availabity
+/o
+
o
STUDY...