Discharge supervision Escalente Crude Oil M/T Sonangol Rangel, ENPA ERA CMBC QUINETRO PORT,


NOVEMBER 19th, 2012
17:00 Vessel arrivedQuintero Port
17:00 N.O.R. tendered
20:22 Pilot onboard
21:05 Vessel Anchored
22:52 Free Pratique
23:06 Authorities Onboard
NOVEMBER20th, 2012
9:06 Surveyor Onboard
09:24-10:24 Measurements and Calculations (H2S)
11:00- 22:30 Operation lightering whit M/T Papudo, Total delivery bySonangol 16.995,960m3
22:30 Final Documents
NOVEMBER 21, 2012
7:48 Pilot on board
9:15 Surveyor on board Second lightering
10:18 11:18 Mooringoperation B/T SONANGOL RANGEL with M/T VALDIVIA


NOVEMBER 22nd, 2012
13:36-05:48 Operation STS M/T Valdivia
NOVEMBER 23rd, 2012
9:42Anchor up
9:00 P.O.B
9:20 Inspector OTI on board
10:06-10.30 Mooring operation monobuoy
10:06-12:00 Measurements vessel H2S and Calculations10:30 Key meeting
10:54-12:36 Connection to manifold 2x 16"
12.54-13.30 Test pressure
13:30-18:10 Sampling onboard
13.30-21.48 Operations in Standby for bad wind´s conditions
21.48 Commenced Displacements 4.200 m3, the shore stop
23.06 Completed Displacements 4.200 m3
23.36 Resumen dischargingEscalante crude Oil
NOVEMBER 24th,2012
18:00 Vessel stop by stripping internal
21:00 Resume discharge
1:25 02:20 Hose disconnection 2x 1601:25 02:00 Final inspection empty tank´s
2:00 Final document on board
02:20 Vessel dispatched by Terminal