Todo
Huntsville
LMSC P038190
Advanced Heavy
Transportation System Studies Technical Area 2 (TA-2) Lift Launch Vehicle Development Contract NAS8-39208 DR 4 Final Report
Prepared by Lockheed Martin Missiles & Space for the Launch Systems Concepts Office of the George C. Marshall Space Flight Center July 1995
ATSS
Final
Report
LMSC
P038190NAS8-39208
Advanced Heavy
Transportation System Studies Technical Area 2 (TA-2) Lift Launch Vehicle Development Contract NAS8-39208 DR4 Final Report Volume I Executive Summary
Approved:
_am'es B. M-CCurry TA-2 Study Manager
_J
Lockheed Martin Missiles & Space-
Huntsville
ATSS Final Volume I
Report
LMSC
P038190
NAS8-39208 Preface
The AdvancedTransportation System Studies (ATSS) Technical Area 2 (TA-2) Heavy Lift Launch Vehicle Development contract, NAS8-39208, was led by the Missile Systems Division of Lockheed Martin Missiles & Space (LMMS), and supported by principal TA-2 team members Lockheed Martin Space Operations (LMSO), Aerojet, ECON, Inc., and Pratt & Whitney. Addition technical task support was provided by Lockheed Martin Skunk Works(LMSW). The ATSS TA-2 contract was managed by James B. McCurry, Lockheed Martin Missiles & Space, and performed for Mr. Gary W. Johnson, Contracting Officer's Technical Representative (COTR), of the Launch Systems Concepts Office (Organization Code PT-51), National Aeronautics and Space Administration George C. Marshall Space Flight Center (MSFC). The purpose of the TA-2 contract was to provideadvanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. The basic period of performanceof the TA-2 contract was from May 1992 through May 1993. No-cost extensions were exercised on the contract from June 1993 through July 1995. This document volumes: Volume I Volume II Volume III is the final report for the TA-2 contract. The final report consists of three
Executive Technical Program
Summary Results Cost Estimates
Volume I provides a summary description of the technicalactivities that were performed over the entire contract duration, covering three distinct launch vehicle definition activities: heavy-lift (300,000 pounds injected mass to low Earth orbit) launch vehicles for the First Lunar Outpost (FLO), medium-lift (50,000-80,000 pounds injected mass to low Earth orbit) launch vehicles, and single-stage-to-orbit (SSTO) launch vehicles (25,000 pounds injected massto a Space Station orbit). Per direction from the TA-2 COTR, Volume II provides documentation of selected technical results from various TA-2 analysis activities, including a detailed narrative description of the SSTO concept assessment results, a user's guide for the associated SSTO sizing tools, an SSTO turnaround assessment report, an executive summary of the ground operations assessmentsperformed during the first year of the contract, a configuration-independent vehicle health management system requirements report, a copy of all major TA-2 Contract presentations, a copy of the FLO launch vehicle final report (NASA document with contributions from TA-2), and references to Pratt & Whitney's TA-2 sponsored final reports regarding the identification of Russian (NPO Energomash) mainpropulsion technologies. Volume III provides a work breakdown structure dictionary, user's guide for the parametric cycle cost estimation tool, and final report developed by ECON, Inc., under subcontract Lockheed Martin on TA-2 for the analysis of heavy lift launch vehicle concepts. Any inquiries regarding the TA-2 contract or its results and products W. Johnson, NASA Marshall Space Flight Center,...