Trabajo sobre urra
La Hidroeléctrica URRÁ I tiene acceso terrestre, por carretera pavimentada, con una longitud de 110 Km desde Montería, capital deldepartamento de Córdoba.
Tiene una capacidad instalada de 340 MW distribuida en cuatro turbinas, de 85 MW cada una, con energía firme de 715 GWh anuales y energía media de 1.440 GWh anuales.
URRÁ IHydroelectric Plant is located northwest of Colombia, 30 kilometers south of the town of Tierralta in the Department of Córdoba. Their main source of water is the Sinu River and its tributaries, whichrise in the Paramillo Park, mostly covered by tropical rainforest and precipitation levels of around 3.000 mm / year, contributing factors maintain an average flow of 340 m3 / s. The Sinu born inParamillo node and travels 350 miles to its mouth on the Caribbean Sea. The area of direct influence of URRÁ I understand the rural municipality of Tierralta.
The Hydro URRÁ I have road access, paved road,with a length of 110 km from Monteria, capital of the department of Cordoba.
it has an installed capacity of 340 MW distributed in four turbines of 85 MW each, with firm energy of 715 GWh per yearand average energy of 1,440 GWh per year.
Desde el inicio de la operación de URRÁ I, se han realizado tres grandes cambios con repercusiones importantes para la empresa como son: la prestación del...