Docum

Páginas: 7 (1653 palabras) Publicado: 6 de febrero de 2013
Manage Instruments


1 Instrument Management Concepts


|What is Manage Instruments? |The Instrument Management window provides the user with an easy way to manage the |
| |instruments and to determine the status of an instrument. Calibration, preventive |
| |maintenance, and servicedates are used to determine whether the instrument maintenance |
| |is up to date. |
|How do I get to the Instrument Management|To open Instrument Management, select the Manage Instruments menu item from the Run menu.|
|window? ||
|My Manage Instruments menu item is |The Instrument Management interface will be available only if the user has the |
|disabled. Why? |ManageInstrument function privilege. |
|Why is the Instrument Management screen |When theInstrument Management is first opened no instruments are displayed. The user |
|blank? |must use the Open Instrument menu item from the Edit menu. The Open Instruments Dialog |
| |allows the user to choose whether to open one instrument, an instrument group or all |
||instruments. |
|What is the meaning of the In Service |You must put an instrument In Service before it will be available to select in any of the|
|box? |Result Entry interfaces. |
|Can I only set the date for a particular |Youcan also enter comments by selecting the appropriate tab for the event and entering |
|event? |the comments in the text pane. You may even be able to enter additional information, |
| |such as external links, depending on the Instrument Event Template that is defined for |
||the Instrument. Refer to the sections on the Instrument Event Template Table and the |
| |Instruments Table for more information. |
|Why is my Instrument tab blank? |There will only be fields displayed on the Instrument tab if the Instrument has an |
||Instrument Template defined and/or the instrument has instrument parameters defined. |
| |Refer to the sections on the Instrument Template Table and the Instruments Table for more|
| |information. |
|Can I only perform one event ata time? |You can perform calibration, preventive maintenance and service events in one operation |
| |for the selected instruments. The Instrument Management screen will stay open to perform |
| |multiple operations on different instruments. |


2 Instrument ManagementScreen


[pic]

The Instrument Management screen can be used to keep track of calibration to components of instruments. A field called Parent Instrument in the Instrument table is used to identify the parent instrument for a component. These component instruments do not initially appear when an instrument is opened in Instrument Management. The components are viewed by selecting...
Leer documento completo

Regístrate para leer el documento completo.

Estos documentos también te pueden resultar útiles

  • Docum
  • documen
  • Docum
  • docum
  • Docume
  • Docume
  • Documen
  • Docum.

Conviértase en miembro formal de Buenas Tareas

INSCRÍBETE - ES GRATIS