Manual Operacion Kauo Heng
KH-323 SERIES OPERATION MANUAL
電腦橫編織機
KH
COMPUTERIZED FLAT KNITTING MACHINE
DEAR CUSTOMER:
Welcome to be an owner of KH-323 series computerized flat knitting machine as Kauo Heng endeavors to maintain a high standard of this machine, we also pleased for your cooperation to make the machine serve longer by reading this operator manual carefully before commencing yourproduction.
Yours sincerely, Kauo Heng Precision Machinery Industrial Co., LTD.
Address:No. 20, Lane 14, Ho Ping Rd., Panchiao, Taipei, Taiwan Tel:886-2-29559258 Fax:886-2-29629153 E-mail:kauoheng@ms58.hinet.net Website:www.kauoheng.com.tw
OVERVIEW OF KH-323 SERIES
1. Yarn carrier selection 2. Carriage 3. Operation bar 4. Main cover 5. Fabric take-down roller 6. Controller 7. Main motor8. Side tension 9. Top tension 10. Side cover
1. Points to observe
1 ○Installation Environmental Conditions Please install the machine as below instructions in order to use this machine in the best condition for a long period of time.
Do not install the machine at a place subject to direct sunshine and/or adjacent to a heat generation source such as a furnace/oven.
Do not install themachine at a place subject to rapid temperature changes. The temperature should be 0℃~ 35℃ inside the controller. Do not install the machine at a place where there is a lot of dust and dirt, or a location affected by chemical gases, sea breeze etc.
Do not install the machine at a place subject to excessive moisture. The humidity should be 30 % ~ 80 %
Do not install the machine on a slope orunstable place.
Please connect the electric power and make sure the ground wire is connected correctly.
1-1
2 ○Fig.1.1 illustrates the correct position of jacking while moving the
machine. It is very important when moving the machine. The yarn carrier rail shall never be used to push the machine since it will distort the rail.
Fig.1.1Correct position of jacking the machine
3 ○Whenconnecting the electric power, attention must be paid to the
correct voltage. And make sure the ground-wire connected.
2. Installation
1 ○After unpacking and locating the machine in the factory, it must be
leveled carefully with a spirit-level to avoid machine distortion in running. We recommend the machine to be leveled with rubber peddings for best result. Remove grease from the polishedparts before starting to operate the machine. About the moving parts must be lubricated according to the following instruction. Lubrication points Carriage Carrier rail Needle bed Driving parts Lubricant #10 oil #10 oil #10 oil Hi-temp grease Table 2.1 Lubrication
2 ○Raise the yarn stand till the end of the tubes is leveled with the base plate,
Frequency Daily Daily Daily Weekly
tightenthe screws and connect the plug of stop motion situated at the left rear end.
1-2
3. Operation
3.1 Power switch As Fig.3.1 front sideof controller, easily find two switches. Filp upward is “ON” and downward is “OFF”. Fluorescent lamp switch
Breaker/power switch
Fig.3.1 Front side of controller 3.2 Operation bar
1 ○Inching:When turning forward of the operation bar, machine operatesslowly and stops when you loosen.
2 ○Starting:When turning backward of the operation bar, machine starts.
Machine starts from slow speed and runs in preset speed when reaching the first terminal sign.
3 ○Stop:When the machine is running, you can turn operation bar in any
direction to stop machine.
4 ○Machine executes protection mode automatically when machine stops
over 3 seconds. Youmust turn twice backward of the operation bar to start.
Inching Starting
Fig.3.2 Starting operation bar
1-3
3.3 Yarn feeder The position of carrier is adjusted according to the desired knitting width, correctly make yarn feeder beside the end working needle by 10 ㎜.The yarn feeder must be in the central position between front and rear needles, also check its height refer to...
Regístrate para leer el documento completo.