Analisis De Precios Unitarios

Páginas: 40 (9903 palabras) Publicado: 19 de febrero de 2013
ANALISIS DE PRECIOS UNITARIOS |
LIMPIEZA Y DESPALME DE TERRENO A MANO, A UNA PROFUNDIDAD DE 0.20M.INCLUYE APILE DE HIERBA Y ACARREO DE LA MISMA AFUERA DE LA OBRA, A 1 KM. | CLAVE: |
| UNIDAD:M2 |
| FECHA: |
| |
CONCEPTO | U | CANTIDAD | P.UNITARIO | IMPORTE |
II.MANO DE OBRA | | | | |
| | | | |
PEON |JOR | 0.012 | 283.38 | 3.40 |
III.HERRAMIENTA | | | | |
HERRAMIENTA MENOR | % | 3 | 3.40 | 0.10 |
. | | | | |
| | | C.D= | 3.50 |
| | INDIRECTOS | |
. | | | SUBTOTAL= | |
| | FINANCIAMIENTO | |
| | | SUBTOTAL= | |
. | |UTILIDAD 10%= | |
. | | | P.V. | |

ANALISIS DE PRECIOS UNITARIOS |
TRAZO Y NIVELACION POR MRDIOS MANUALES EN TERRENO PLANO PARA DESPLANTE DE ESTRUCTURA ESTABLECIENDO EJES, PASOS Y REFERENCIAS CONCRUCETAS Y MOJONERAS, INCLUYE MATERIALES Y MANO DE OBRA. | CLAVE: |
| UNIDAD:M2 |
|FECHA: |
| |
CONCEPTO | U | CANTIDAD | P.UNITARIO | IMPORTE |
I.MATERIALES | | | | |
CALHIDRA | KG | 0.25 | 3.50 | 0.88 |
BARROTE | PT | 0.027 | 12.00 | 0.32 |
DUELA 3/4"X4”X8” | PT | 0.018 | 14.84 | 0.27 |HILO PLASTICO | ML | 0.35 | 1.30 | 0.46 |
PINTURA DE ESMALTE | LT | 0.003 | 73.00 | 0.22 |
CONCRETO F´C= 100 KG/CM2 | M3 | 0.005 | 780.04 | 0.39 |
II.MANO DE OBRA | | | | |
OF.ALBAÑIL | JOR | 0.012 | 491.56 | 5.90 |
AYUDANTE GENERAL | JOR | 0.012 |352.54 | 4.23 |
. | | | | |
III.HERRAMIENTA | | | | |
HERRAMIENTA MENOR | % | 3 | 10.13 | 0.30 |
. | | | | |
. | | | | |
| | | C.D= | 12.97 |
| | INDIRECTOS | |
| | | SUBTOTAL= | |
| | FINANCIAMIENTO | |
| | | SUBTOTAL= | |
| | UTILIDAD 10%= | |
| | | P.V.| |

ANALISIS DE PRECIOS UNITARIOS |
EXCAVACION EN CEPAS DE 0 A 2 M DE PROFUNDIDAD, A MANO EN MATERIAL TIPO B EN SECO, INCLUYE AFINE DE TALUDES. | CLAVE: |
| UNIDAD:M3 |
| FECHA: |
| |
CONCEPTO | U | CANTIDAD | P.UNITARIO | IMPORTE |
II.MANO DE OBRA | | | | |
| | | ||
AYUDANTE GENERAL | JOR | 0.35 | 352.54 | 123.39 |
III.HERRAMIENTA | | | | |
HERRAMIENTA MENOR | % | 3 | 123.39 | 3.70 |
. | | | | |
| | | C.D= | 127.09 |
| | INDIRECTOS | |
. | | | SUBTOTAL= | |
| | FINANCIAMIENTO | |
| | |SUBTOTAL= | |
. | | UTILIDAD 10%= | |
. | | | P.V. | |

ANALISIS DE PRECIOS UNITARIOS |
PLANTILLA DE CONCRETO POBRE HECHO EN OBRA T.M.A. 3/4 DE 5CMDE ESPESOR F´C=100 KG/CM2. INCLUYE ACARREOS. | CLAVE: |
| UNIDAD:M2 |
| FECHA: |
| |CONCEPTO | U | CANTIDAD | P.UNITARIO | IMPORTE |
I.MATERIALES | | | | |
CONCRETO F´C=100KG/CM2 | M3 | 0.0525 | 780.04 | 40.95 |
II.MANO DE OBRA | | | | |
OF.ALBAÑIL | JOR | 0.032 | 491.56 | 15.73 |
AYUDANTE GENERAL | JOR | 0.032 | 352.54 | 11.28 |
III.HERRAMIENTA | | | | |
HERRAMIENTA MENOR | % | 3 | 27.01 |...
Leer documento completo

Regístrate para leer el documento completo.

Estos documentos también te pueden resultar útiles

  • analisis de precios unitarios en construccion
  • analisis de precios unitarios
  • Analisis De Precio Unitario
  • Analisis de precio unitario
  • Formatos Y Análisis De Precios Unitarios
  • Análisis De Precios Unitarios
  • Análisis de precios unitarios
  • Analisis de un precio unitario

Conviértase en miembro formal de Buenas Tareas

INSCRÍBETE - ES GRATIS