WELDING CONTROL
11.1 GENERAL
11.1.1. All welding on Code work shall be performed using Welding Procedure Specifications WPSs and welders or welding operators qualified in accordance with the applicable Code of construction and the Section IX.

11. 2. WELDING PROCEDURE SPECIFICATION (WPS)

11.2.1. WPSs are written by the WE, the QCIshall monitor and record all actual essential and supplementary essential (if applicable) variables and supervise the welders during the welding of test coupons. Preparation and testing of the required specimens is performed to Section IX requirements by a testing laboratory. The test report submitted by the laboratory is reviewed by the QCM and if acceptable he prepares and certifies theProcedure Qualification Record (PQR).

11.2.2. Original copies of qualified WPS and PQR and laboratory test reports are maintained by the QCM. Copies of the WPS are provided to the Shop and Field Manager for use by the welders and welding operators.

11.2.3. WPS are revised when there is a change in a nonessential variable and a new PQR shall bequalified when there is a change in an essential or supplementary essential variable.

11.2.4. WPSs and PQRs are submitted to the AI for review. The AI shall have the right to call for and witness the test of a welding procedure.

11.3. QUALIFICATION OF WELDERS AND WELDING OPERATORS

11.3.1. All welders and welding operatorsto be used for Code welding are qualified according to Section IX and the Code Section used for Construction under the supervision of the Shop Supervisor or Field Foreman and witnessed by the QCM. The preparation and testing of the required specimens is performed by a testing laboratory. The report of test is reviewed by the QCM and if acceptable he prepares and certifies the Welder PerformanceQualification report (WPQ) or the Welding Operator Performance Qualification report (WOPQ).

11.3.2. The QCM issues each qualified welder a unique stamp with which they identify each weld they make at intervals of no more than one meter. When conditions prevent such stamping the QCI enters the welder stamp on the Weld Map (EIP-Annex C- Exhibit 9.1) for each weld they make.11.3.3. Copies of the WPQ/ WOPQ are provided to the Shop Supervisor and Field Foreman for their respective welders. The original records and reports of test are maintained by the QCM.



11.3.4. WPQ/ WOPQ are available for review and acceptance by the AI who shall have the right to call for and witness the test of theability of any welder or welding operator.

11.4. REQUALIFICATION OF WELDERS AND WELDING OPERATORS

11.4.1. Welders and welding operators are re-qualified when:

a) A change in Performance Essential Variable occurs.
b) They have not welded with a process for a period of six (6) months or more theirqualifications for that process shall expire; unless, within the six month period, prior to his expiration of qualification:

(1) The welder has welded with that process using manual or semiautomatic welding, under the supervision of the Shop/Field Foreman; that will extend his qualification for an additional 6 months.
(2) The welding operator has weldedwith that process using machine or automatic welding, under the supervision of the Shop/Field Foreman; that will extend his qualification for an additional 6 months.

c) Where there is reason to question their ability to make welds that meet the specification, the qualifications that support the welding they are doing shall be revoked. All other qualifications not...
Leer documento completo

Regístrate para leer el documento completo.

Estos documentos también te pueden resultar útiles

  • asme
  • Asme
  • asme
  • Asme
  • Asme
  • asme
  • asme
  • asmee

Conviértase en miembro formal de Buenas Tareas

INSCRÍBETE - ES GRATIS