perforacion
Metodología en Operaciones de Cementación Primaria y Forzada
Utilizando Nuevas Tecnologías
Pierre Andrés Herzog Zambrano (1), Karen Katherine Camba Holguín (2), Mayra Lissette Salinas Merchán (3)
Xavier Ernesto Vargas Gutiérrez * Facultad en Ciencias de la Tierra (1) (2) (3) * Escuela Superior Politécnica del Litoral
Campus Gustavo Galindo, Km 30.5 vía Perimetral
Apartado 09-01-5863.Guayaquil, Ecuador (1) (2) (3) *
pherzog@espol.edu.ec (1), kcamba@espol.edu.ec (2), msalinas@espol.edu.ec (3)
* Director de Tesis, Escuela Superior Politécnica del Litoral, Ingeniero en Petróleo, xevargas@espol.edu.ec.com
Resumen
El propósito del presente trabajo consiste en el análisis y planteamiento de una alternativa operativa factible para la cementación primaria del pozoCHS-3D, el cual se encuentra en el campo Yuca.
Se determina los volúmenes de cemento para la lechada de cola y lechada de relleno que se requieren para cementar cada una de las secciones del programa, se compara el diseño de la cementación de la alternativa
propuesta con el modelo actual y
se determina que en cada sección los excesos
de la lechada varían
significativamente, en lasprimeras dos secciones se cementara hasta superficie diseñando así dos lechadas y en la sección del liner se cementara con una sola lechada.
Los resultados se analizan en forma comparativa. Partiendo de estos se concluye que el programa propuesto de cementación es aplicable. Se recomienda para evitar los problemas operacionales que se presentaran en el desarrollo de los trabajos considerarque el anular debe estar ausente de sustancias contaminantes y la preparación de la lechada de cemento en composición, volumen y tiempo debe ser la adecuada
Palabras Claves: Cementación, Cementación Primaria, Diseño de la Cementación de Pozos
Abstract
The purpose of this work consists in the analysis of an operative alternative that is possible for the cementing of the
CHS-3Dwell, the one that is in Yuca field.
We determine the volume of the cement for the lead cement and tail cement, that is required to cement each one of the sections of the program, we compare the design of this proposal with the actual model, and we determined that in each section the excess of the cement vary significantly in the first two sections we will cement up to the surface designing twocement and in the liner section we will cement with only one cement.
The results will be analyzed in a comparative form. Based on it we conclude that the cementing program that is in our proposal is applicable.
It is recommended that to avoid the operational problems that could occur during the development of this work, we must consider that the annular must be with no contaminants and that thecement is composition, volume and time must be the adequate.
Key words: Cementing, Primary cementing, Well cementing design.
1. Introducción
En la Industria Petrolera la cementación de un pozo es el proceso mediante el cual se coloca una lechada de
formando un sello hidráulico, que se forma entre las formaciones y el revestidor, con el fin de evitar la migración de los fluidos entresí, entre otras funciones podemos mencionar:
cemento en el espacio anular formado entre las
Soportar la tubería de
revestimiento y que el
formaciones que se han perforado
y la tubería de
cemento se adhiera perfectamente a la formación
revestimiento, en muchos casos esto puede hacerse en una operación simple, a través de bombear cemento debajo de la tubería derevestimiento a través del zapato guía del revestimiento, hacia arriba y dentro del espacio anular.
y al revestidor formando un sello hidráulico
impermeable.
Sellar zonas de pérdida de circulación.
Proteger el revestidor de la corrosión producida por aguas subterráneas.
En este trabajo se presenta una breve explicación de
Prevenir surgencias
formaciones expuestas
(Blow Out)...
Regístrate para leer el documento completo.