Implementacion De Procesos

Páginas: 3 (690 palabras) Publicado: 19 de junio de 2012
A
Introduction

CUTTING DATA

CoroCut® 1-, 2- and 3-edge

Cutting speed recommendations
The recommendations are valid for use with cutting fluid.
Specific cutting force kc 0.4 CMC ISO No. P01.1 01.2 01.3 02.1 02.2 02.2 Steel 03.11 03.21 06.1 06.2 06.3 06.33 Material Unalloyed C = 0.1–0.25% C = 0.25–0.55% C = 0.55–0.80% Low-alloy ≤5% Non-hardened Hardened and tempered Hardened andtempered High-alloy >5% Annealed Hardened tool steel Castings Unalloyed Low-alloy (alloying elements ≤5%) High-alloy (alloying elements >5%) Manganese steel, 12–14% Mn N/mm2 2000 2100 2200 2150 2550 28502500 3900 2000 2100 2650 3600 Specific cutting force kc 0.4 CMC ISO No. M 05.11 05.12 05.13 Material Ferritic/martensitic Bars/forged Non-hardened PH-hardened Hardened Austenitic Bars/forged AusteniticPH-hardened Super austenitic Austenitic-ferritic (Duplex) Bars/forged Weldable < 0.05%C Ferritic/martensitic Cast Non-hardened Hardened Austenitic Cast Austenitic PH-hardened Austenitic-ferritic(Duplex) Cast Non-weldable ≥ 0.05%C Weldable < 0.05%C N/mm2 Hardness Brinell >> GC2145 0.05-0.5

C
Internal machining

D
165-75 130-60 140-65 160-70 120-55 130-55 145-65 110-45 120-50 130-100 90-70100-75 130-50 110-40 110-45

185-90 130-60 140-65

175-80 120-55 130-60

165-70 105-50 115-55

125-95 75-55 85-65

140-55 95-45 105-50

155-75 130-60

145-70 120-55

135-60 110-50125-95 95-70

125-50 100-45

E

150-70 125-55

140-65 120-50

130-60 110-45

110-85 70-55

120-45 100-40 Drilling

160-80 105-55

150-70 95-50

135-60 90-45

105-80 65-50

125-5080-38

135-65 110-55

125-60 105-50

115-55 95-45

110-85 85-60

105-45 80-39

F

G

H
CUTTING DATA CoroCut ® 1-, 2- and 3-edge

F9

General Information

Grades

Cutting dataMilling

A
Introduction

CUTTING DATA

CoroCut® 1-, 2- and 3-edge

Cutting speed recommendations
The recommendations are valid for use with cutting fluid.
Specific cutting force kc...
Leer documento completo

Regístrate para leer el documento completo.

Estos documentos también te pueden resultar útiles

  • METODOLOGIA DEL PROCESO DE IMPLEMENTACIÓN DE LA CALIDAD
  • PROCESO DE IMPLEMENTACIÓN DE UN SISTEMA CRM
  • Implementación de procesamiento de datos
  • Implementacion de la oralidad en proceso civil
  • Implementacion de procesamiento de datos
  • Implantaciòn e implementaciòn en un proceso.
  • Implementación de procesos con jbpm
  • Metodologia Del Proceso De Implementacion De La Calidad

Conviértase en miembro formal de Buenas Tareas

INSCRÍBETE - ES GRATIS