Ingeniería de detalle líneas y redes primarias
INGENIERÍA DE DETALLE LÍNEAS Y REDES PRIMARIAS
RELACIÓN DE PLANOS DE LÍNEA PRIMARIA
|ITEM |N° PLANO |DESCRIPCIÓN|L (Km.) |
| | |Sector Ticapampa – Aija | |
|1|LP-TIC-AIJA 1/15 AL 15/15|LP 22.9 kV 3( Ticapampa – Aija 3x35 mm² AAAC |19,404 |
|2 |LP-TIC-TUCU 1/4 AL 4/4 |LP 13.2 kV MRT Derivación a Tucuhuain 1x25mm² AAAC |4,032 |
|3 |LP-TIC-YANA1/4 AL 4/4 |LP 13.2 kV MRT Derivación a Yanayacu 1x25 mm² AAAC |5,539 |
|4 |LP-SIN-PACH 1/2 AL 2/2|L.P. 13.8 kV 2( Derivación Shiqui – Pachacoto 2x25 mm² AAAC |1.982 |
|5 |LP-COR-ALMI 1/6 AL 6/6 |L.P. 13.8 kV 2( Coris – Almizcle 2x25 mm² AAAC|7,412 |
|6 |LP-HUALLAC 1/3 AL 3/3 |L.P. 13.8 kV 2( Derivación Huellac 2x25 mm² AAAC |2,476 |
|7 |LP-PARAC 1/2 AL 2/2 |L.P. 13.8 kV 2(Derivación Parac 2x25 mm² AAAC |1,393 |
|8 |LP-YANAMITO 1/1 |LP 13.2 kV MRT Derivación a Yanamito 1x25 mm² AAAC |0,439 |
|9|LP-SINCUNA 1/1 |LP 13.2 kV MRT Derivación a Sincuna 1x25 mm² AAAC |0.691 |
|10 |LP-LLULLICAN 1/1 |LP 13.2 kV MRT Derivación a Llullicachi 1x25 mm² AAAC|0,419 |
|11 |LP-RANCHIN 1/1 |L.P. 13.8 kV 2( Derivación Ranchin 2x25 mm² AAAC |0,635 |
| ||Sector Cotaparaco | |
|12 |LP-ALP-COCH 1/5 AL 5/5 |LP 22.9 kV 2( Allpacocha – Cochapeti 2x25 mm² AAAC |5.958...