Precio de materiales, aprox.

Páginas: 7 (1750 palabras) Publicado: 22 de octubre de 2010
RESIDENCIA UNIFAMILIAR | | | | | |
| | | | | | | |
Cantidad | Material | Precio | | | | | |
Aglomerantes y agregados | | 5% MAS EN EL 2009 | VALOR 2009 | 5% MAS EN EL 2010 | VALOR 2010 | |
Saco (42.5 KG) | Cemento gris UGC | Q 63.20 | 3.16 | Q 66.36 | 3.318 | Q 69.68 | |
Saco | Cal horcalsa | Q 31.65 | 1.5825 | Q33.23 | 1.661625 | Q 34.89 | |
Metro cubico | Piedrin 3/4" | Q 237.50 | 11.875 | Q 249.38 | 12.46875 | Q 261.84 | |
Metro cubico | Arena de rio | Q 93.75 | 4.6875 | Q 98.44 | 4.921875 | Q 103.36 | |
Metro cubico | Arena amarilla | Q 90.00 | 4.5 | Q 94.50 | 4.725 | Q 99.23 | |
Metrocubico | Arena blanca | Q 90.00 | 4.5 | Q 94.50 | 4.725 | Q 99.23 | |
unidad | Hilo p/pescar 100mt | Q 12.00 | 0.6 | Q 12.60 | 0.63 | Q 13.23 | |
Block de pomez | | | | | | | |
Millar | Block pomez de 014 x .19 x .39 | Q 3,300.00 | 165 | Q 3,465.00 | 173.25 | Q 3,638.25 | |
Millar | Block en "U" .14x .19 x .39 | Q 3,300.00 | 165 | Q 3,465.00 | 173.25 | Q 3,638.25 | |
Piedra | | | | | | | |
metro cuadrado | Piedra laja tratada | Q 70.00 | 3.5 | Q 73.50 | 3.675 | Q 77.18 | |
Hierro | | | | | | | |
Quintal | hierro 3/8" grado 40 legitimo | Q 590.00 | 29.5 | Q 619.50 | 30.975 | Q 650.48 | |Quintal | hierro 1/2" grado 40 legitimo | Q 565.00 | 28.25 | Q 593.25 | 29.6625 | Q 622.91 | |
Quintal | hierro 1/4" grado 40 legitimo | Q 605.00 | 30.25 | Q 635.25 | 31.7625 | Q 667.01 | |
Quital | Alambre de amarre | Q 790.00 | 39.5 | Q 829.50 | 41.475 | Q 870.98 | |
Clavos | | | | | | | |
Quintal| clavo con cabeza 1" - 4" | Q 630.00 | 31.5 | Q 661.50 | 33.075 | Q 694.58 | |
Madera | | | | | | | |
pie tabla | pino rustico | Q 5.20 | 0.26 | Q 5.46 | 0.273 | Q 5.73 | |
Lamina HG | | | | | | | |
unidad | lamina 8 pies | Q 95.00 | 4.75 | Q 99.75 | 4.9875 | Q 104.74 | |unidad | lamina 10 pies | Q 115.00 | 5.75 | Q 120.75 | 6.0375 | Q 126.79 | |
unidad | lamina 12 pies | Q 140.00 | 7 | Q 147.00 | 7.35 | Q 154.35 | |
Hidraulicas | | | | | | | |
Unidad | Llave de paso | Q 65.00 | 3.25 | Q 68.25 | 3.4125 | Q 71.66 | |
Unidad | Llave de compuerta | Q75.00 | 3.75 | Q 78.75 | 3.9375 | Q 82.69 | |
Unidad | Llave de cheque | Q 75.00 | 3.75 | Q 78.75 | 3.9375 | Q 82.69 | |
Unidad | Contador | Q 350.00 | 17.5 | Q 367.50 | 18.375 | Q 385.88 | |
Unidad 6mt | Tubo PVC 3/4" | Q 41.63 | 2.0815 | Q 43.71 | 2.185575 | Q 45.90 | |
Unidad6 mt | Tubo PVC 1/2" | Q 32.80 | 1.64 | Q 34.44 | 1.722 | Q 36.16 | |
Unidad | Codo 90° PVC Ø 1/2" | Q 1.72 | 0.086 | Q 1.81 | 0.0903 | Q 1.90 | |
Unidad | Codo 90° PVC Ø 3/4" | Q 2.38 | 0.119 | Q 2.50 | 0.12495 | Q 2.62 | |
Unidad | Tee PVC Ø 1/2" | Q 1.72 |0.086 | Q 1.81 | 0.0903 | Q 1.90 | |
Unidad | Tee PVC Ø 3/4" | Q 2.72 | 0.136 | Q 2.86 | 0.1428 | Q 3.00 | |
Unidad | Copla PVC Ø 1/2" | Q 1.13 | 0.0565 | Q 1.19 | 0.059325 | Q 1.25 | |
Unidad | Copla PVC Ø 3/4" | Q 2.13 | 0.1065 | Q 2.24 | 0.111825 | Q 2.35...
Leer documento completo

Regístrate para leer el documento completo.

Estos documentos también te pueden resultar útiles

  • lista precios materiales construccion
  • precios de materiales de construccion Guatemala
  • Precios Material Arquitectura
  • lista de precios materiales de construccion
  • Materiales y precios
  • precios de materiales
  • El alto precio del materialismo para nuestra en el Mundo.
  • INEI Precios De Materiales De Construcci N Subieron 2

Conviértase en miembro formal de Buenas Tareas

INSCRÍBETE - ES GRATIS