Go Up to Table of Contents Go To Chapter 8 Go To Chapter 10 (Construction Pricing and Contracting) (Fundamental Scheduling Procedures) Construction Planning Basic Concepts in the Development of Construction Plans Choice of Technology and Construction Method Defining Work Tasks Defining Precedence Relationships Among ActivitiesEstimating Activity Durations Estimating Resource Requirements for Work Activities Coding Systems References Problems Footnotes

9. Construction Planning
9.1 Basic Concepts in the Development of Construction Plans
Construction planning is a fundamental and challenging activity in the management and execution of construction projects. It involves the choice of technology, the definition of work tasks,the estimation of the required resources and durations for individual tasks, and the identification of any interactions among the different work tasks. A good construction plan is the basis for developing the budget and the schedule for work. Developing the construction plan is a critical task in the management of construction, even if the plan is not written or otherwise formally recorded. Inaddition to these technical aspects of construction planning, it may also be necessary to make organizational decisions about the relationships between project participants and even which organizations to include in a project. For example, the extent to which sub-contractors will be used on a project is often determined during construction planning. Forming a construction plan is a highly challengingtask. As Sherlock Holmes noted: Most people, if you describe a train of events to them, will tell you what the result would be. They can put those events together in their minds, and argue from them that something will come to pass. There are few people, however, who, if you told them a result, would be able to evolve from their own inner consciousness what the steps were which led up to thatresult. This power is what I mean when I talk of reasoning backward. [1] Like a detective, a planner begins with a result (i.e. a facility design) and must synthesize the steps required to yield this result. Essential aspects of construction planning include the generation of required activities, analysis of the implications of these activities, and choice among the various alternative means ofperforming activities. In contrast to a detective discovering a single train of events, however, construction planners also face the normative problem of choosing the best among numerous alternative plans. Moreover, a detective is faced with an observable result, whereas a planner must imagine the final facility as described in the plans and specifications. In developing a construction plan, it iscommon to adopt a primary emphasis on either cost control or on schedule control as illustrated in Fig. 9-1. Some projects are primarily divided into expense categories with associated costs. In these cases, construction planning is cost or expense oriented. Within the categories of expenditure, a distinction is made between costs incurred directly in the performance of an activity and indirectly forthe accomplishment of the project. For example, borrowing expenses for project financing and
http://www.ce.cmu.edu/pmbook/09_Construction_Planning.html (1 of 24)01.03.2007 17:09:31

Project Management for Construction: Construction Planning

overhead items are commonly treated as indirect costs. For other projects, scheduling of work activities over time is critical and is emphasized in theplanning process. In this case, the planner insures that the proper precedences among activities are maintained and that efficient scheduling of the available resources prevails. Traditional scheduling procedures emphasize the maintenance of task precedences (resulting in critical path scheduling procedures) or efficient use of resources over time (resulting in job shop scheduling procedures)....
Leer documento completo

Regístrate para leer el documento completo.

Estos documentos también te pueden resultar útiles

  • Open proj
  • ENTRE PROJIMOS
  • los projimos
  • Introdução Ao Proj De Estradas
  • Proj 1
  • Proj Manag
  • Butique E Spa, Paris. Proj. Andrée Putman.
  • Análisis de la obra los prójimos

Conviértase en miembro formal de Buenas Tareas

INSCRÍBETE - ES GRATIS