Aabattoir
abattoir abattoir
(Industrial Engineering) A building in cattle or Other Animals Which Are siaughtered.
abnormal time abnormal time
(Industrial Engineering) Düring to study time, an elapsed time for Which element is excessively Any Longer or Shorter Than the Media of the elapsed times. Also known as abnormal reading. Also known as abnormal reading.
acceleration signatureacceleration signature
(Industrial Engineering) A printed record That shows the pattern of acceleration and deceleration of an anatomical reference point in the performance of a task.
accelerometry accelerometry
(Industrial Engineering) The quantitative determination of acceleration and deceleration in the Entire human body or a part of the body in the performance of a task.
acceptable quality levelacceptable quality level
(Industrial Engineering) The maximum Percentage of Defects That Has Been Determined tolerable as a process average for a sampling plan DURING inspection or test of a product with Respect to Economic and Functional Requirements of the item. Abbreviated AQL. Abbreviated AQL.
acceptable reliability level acceptable reliability level
(Industrial Engineering) The Level ofreliability required for to part system, device, and so forth; May Be Expressed in a Variety of Terms, for Example, Number of Failures Allowable Operating in 1000 hours of life, ARL Abbreviated.
acceptance criteria Acceptance criteria
(Industrial Engineering) Standards of judging the Acceptability of Manufactures items.
acceptance number Acceptance number
(Industrial Engineering) The MaximumAllowed number of defective pieces in a sample of Specified size
acceptance sampling Acceptance sampling
(Industrial Engineering) Taking a sample from a batch of material to inspect for Determining whether the Entire Lot Will Be Accepted or Rejected.
acceptance test Acceptance Test
(Industrial Engineering) todetermine Used to test conformance of a product to design Specifications, ITS as abasis for acceptance.
accident frequency rate accident frequency rate
(Industrial Engineering) The number of all disabling Injuries per million worker-hours of exposure.
accident severity rate
(Industrial Engineering) The number of worker-days lost as a result of disabling revile per thousand worker-hours of exposure.
accident-cause code accident-causing code
(Industrial Engineering)Sponsored by the American Standards Association, the code That classifier accidents defective under eight and nine Working Conditions Improper working practices.
accumulative timing accumulative timing
(Industrial Engineering) A time-study method That Allows direct reading of the time 'for each element of an operation by the use of two alternately Operate Which stopwatch.
activity chart activitychart
(Industrial Engineering) A tabular presentation of a series of Operations of a process Plotted Against a time scale.
actual cost Current cost
(Industrial Engineering) Cost Determined by an allocation of cost DURING Factors Recorded production.
actual time Current time
(Industrial Engineering) Time taken by a worker to Perform a Given Task.
affreightment affreightment
(IndustrialEngineering) The lease of a vessel for the transportation of goods.
aggregate production scheduling aggregate production scheduling
(Industrial Engineering) A type of planning at a broad level Without consideration of individual products and Activities in order to Develop a program of output That Will Meet future demand Given under constraints.
agile manufacturing agile manufacturing(Industrial Engineering) Operations That Can Be Rapidly Changing market reconfigured to Satisfy Demands.
allocate allocate
(Industrial Engineering) To assign a Portion of a resource to an activity.
allowed time

allowed time
(Industrial Engineering) Amount of time allowed for personal Needs Each employee work DURING a cycle.
amortize
(Industrial Engineering) To reduce an obligation Gradually...
Leer documento completo

Regístrate para leer el documento completo.

Estos documentos también te pueden resultar útiles

  • Psicología Segundo Semestre 7
  • Laboratorio 7 Semestre I.Q.
  • Cuadro comparativo de 7 semestre
  • Diagnostico 2° Semestre 7°
  • Unidad 7 Matematicas 3 Semestre
  • problemas en la escuela primaria 7° semestre
  • 7 Categorias De Un Proceso Industrial
  • Quimica industrial practica 7

Conviértase en miembro formal de Buenas Tareas

INSCRÍBETE - ES GRATIS