Proyecto supermercad

Páginas: 6 (1307 palabras) Publicado: 8 de abril de 2011
RUPO 1.- 1/10 DE CABO + 1 PEON |   |   |   |   |   |   |
ACTIVIDAD: EXCAVACIONES, ACARREOS, RELLENOS, ETC. |   |   |   |   |   |   |
BIBLIOGRAFIA: SUAREZ SALAZAR(MEXICO) | | | | | | |
GRUPO 2.- 1/4 DE OFICIAL ALBAÑIL + 1 PEON |   |   |   |   |   |   |
ACTIVIDAD: PLANTILLAS, FIRMES, VACIADOS DE CONCRETO, ETC. |   |   |   |   |   |   |
| | | | | | |
GRUPO 3.- 1 OFICIALCARPINTERO + 1 AYUDANTE CARPINTERO |   |   |   |   |   |   |
ACTIVIDAD: CIMBRA DE CIMENTACION, COLUMNAS, TRABES, ETC. |   |   |   |   |   |   |
| | | | | | |
GRUPO 4.- 1/2 OFICIAL FIERRERO + 1 AYUDANTE FIERRERO |   |   |   |   |   |   |
ACTIVIDADES: ACERO EN CIMENTACION, COLUMNAS, TRABES, ETC. |   |   |   |   |   |   |
| | | | | | |
GRUPO 5.-  1 OFICIAL ALBAÑIL + 1 PEON |   |  |   |   |   |   |
ACTIVIDAD: CIMENTACION DE PIEDRA, DALAS, CASTILLOS, MUROS, ETC. |   |   |   |   |   |   |
| | | | | | |
GRUPO 6.- 1 OFICIAL ESPECIALISTA + 1 PEON |   |   |   |   |   |   |
ACTIVIDAD:  PISOS, TERRAZO, AZULEJO, CINTILLA, CERAMICA, ETC. |   |   |   |   |   |   |
| | | | | | |
| | | | | | |
  | | | | | | |
| | | | | | |
CONCEPTO| UNIDAD | GRUPO | RENDIMIENTO APROXIMADO
POR GRUPO |
PRELIMINARES Y CIMENTACION | | | |
LIMPIA Y TRAZO | M2 | 2 | 50.00 | M2 | / | JORNAL |
EXCAVACION EN TIERRA HASTA 2.00 M. DE PROFUNDIDAD | M3 | 1 | 4.00 | M3 | / | JORNAL |
EXCAVACION EN TEPETATE BLANDO HASTA 2.00 M. DE PROFUNDIDAD | M3 | 1 | 2.00 | M3 | / | JORNAL |
TRASPALEO HASTA 2.00 M. | M3 | 1 | 18.00 | M3 | / | JORNAL |ACARREO CON CARRETILLA A 20 M. MAXIMO | M3 | 1 | 5.00 | M3 | / | JORNAL |
RELLENOS POR CAPAS, COMPACTADAS CON PISON DE MANO | M3 | 1 | 7.00 | M3 | / | JORNAL |
COMPACTACION DE CEPAS CON PISON DE MANO | M2 | 1 | 35.00 | M2 | / | JORNAL |
PLANTILLAS DE CONCRETO (HORMIGON) ENTRE 0.7 Y 0.10 M. | M2 | 2 | 14.00 | M2 | / | JORNAL |
CIMIENTO DE PIEDRA BRAZA | M3 | 5 | 3.00 | M3 | / | JORNAL |
|| | | | | |
HABILITADO Y ARMADO DE ACERO DE REFUERZO | | | | | | |
a) EN CIMENTACION | TON | 4 | 0.17 | TON | / | JORNAL |
b) EN ESTRUCTURA | TON | 4 | 0.16 | TON | / | JORNAL |
c) HABILITADO Y ARMADO DE ALAMBRON DE 1/4" Y 5/16" DE DIAMETRO | TON | 4 | 0.13 | TON | / | JORNAL |
| | | | | | |
CIMBRAR Y DESCIMBRAR, ACABADO NO APARENTE | | | | | | |
a) ENCIMIENTO | M2 | 3 | 9.50 | M2 | / | JORNAL |
b) EN COLUMNAS RECTANGULARES | M2 | 3 | 7.50 | M2 | / | JORNAL |
c) EN COLUMNAS CIRCULARES | M2 | 3 | 6.00 | M2 | / | JORNAL |
d) EN TRABES | M3 | 3 | 10.00 | M3 | / | JORNAL |
e) EN LOSAS | M2 | 3 | 10.00 | M2 | / | JORNAL |
f) CIMBRAR Y DESCIMBRAR CON SONOTUBO | M | 3 | 15.00 | M | / | JORNAL |
| | | | | | |
LOSAS RETICULARES | | || | | |
COLOCACION BLOCK HASTA 20X40X40 CM. | CAJA | 2 | 100.00 | CAJA | / | JORNAL |
COLOCACION DE BLOCK HASTA 35X60X60 CM. | CAJA | 2 | 40.00 | CAJA | / | JORNAL |
ENTREPISO RETICULAR CELULADO LINEA MENOR | CAJA | 2 | 40.00 | CAJA | / | JORNAL |
ENTREPISO RETICULAR CELULADO LINEA MAYOR | CAJA | 2 | 30.00 | CAJA | / | JORNAL |
| | | | | | |
COLADOS  (NO INCLUYE LAFABRICACION DEL CONCRETO (HORMIGON)) |   |   | | | | |
a) EN CIMIENTOS | M3 | 2 | 1.50 | M3 | / | JORNAL |
b) EN COLUMNAS Y MUROS | M3 | 2 | 0.85 | M3 | / | JORNAL |
c) EN TRABES Y LOSAS | M3 | 2 | 0.95 | M3 | / | JORNAL |
d) EN LOSAS RETICULARES | M3 | 2 | 0.80 | M3 | / | JORNAL |
e) CURADO DE CONCRETO CON AGUA EN SUPERFICIES HORIZONTALES | M3 | 1 | 10.00 | M3 | / | JORNAL |
f) CURADO DECONCRETO CON AGUA | M2 | 1 | 300.00 | M2 | / | JORNAL |
g) CURADO DE CONCRETO CON AGUA EN SUPERFICIES VERTICALES | M2 | 1 | 100.00 | M2 | / | JORNAL |
  |   |   |   |   | / | JORNAL |
  |   |   |   |   | / | JORNAL |
| | | | | | |
MUROS DE TABIQUE COMUN O LIGERO NO APARENTE | | | | | | |
a) DE 0.07 M. DE ESPESOR | M2 | 5 | 11.00 | M2 | / | JORNAL |
b) DE 0.14 M. DE...
Leer documento completo

Regístrate para leer el documento completo.

Estos documentos también te pueden resultar útiles

  • proyecto el supermercado
  • Proyecto Supermercado
  • Proyecto de supermercado
  • Proyecto de supermercado
  • proyecto de un nuevo supermercado
  • Proyecto supermercado de licores
  • Proyecto Para Un Supermercado
  • desarrollo proyecto supermercado integral

Conviértase en miembro formal de Buenas Tareas

INSCRÍBETE - ES GRATIS