reflex Emmanuel
Líneas:
Block MC
M Esc. QW
Emmanuel Olvera
Block MC
Fractura acumulada Motor 2
FY'15
$112,612.7
$120,000
$106,060.7
$100,000
$71,648.2
$54,508.1
$80,000
$60,000
$40,000$24,372.5
$21,763.3
$18,458.0
$15,255.4
$14,556.7
$12,411.0
$9,369.8
$7,691.1
$7,504.5
$6,781.2
$3,273.4
$1,738.2
$1,459.0
$1,392.0
$1,369.0
$20,000
$0
$0.0 $0.0 $0.0 $0.0 $0.0
$40,000
FracturaPresupuesto
$37,635 $37,662
$35,000
Presupuesto vs Fractura
$34,263 $33,476
$30,000
$25,000
$20,000
$15,000
$10,000
$6,422.0
$5,000
$0
$3,988.0
ABR
MAY
$4,845.4
JUN
$0.0
JUL
$0
$0.0
AGO
$0$0.0
SEP
$0
$0.0
OCT
$0
$0.0
NOV
$0
$0.0
DIC
$0
$0.0
ENE
$0
$0.0
FEB
$0
$0.0
MAR
Block MC
Top 10 Fractura ($)
$2,500.00
$2,000.00
$1,500.00
$1,000.00
$2,142.0
$2,012.0
$500.00
$ 875.0$0.00
44B12055
45B12050
44B12051
Logros
- Hay mayor participación por parte de
los operadores en cuanto a aviso y
análisis de la fractura.
$1.0
$0.0
$ 0.0
$0.0
$0.0
$0.0
$0.0
43B1206548H12004
43B12054
43B12060
43B12061
44B12050
44B12053
Oportunidades
- Reducir defectivo y afectación
por concepto de herramienta.
Tareas
- Continuar con el empuje de la
Campaña drill para eliminar lareincidencia de Rotura
M. Esc. QW
Fractura acumulada Motor 2
FY'15
$112,612.7
$120,000
$106,060.7
$100,000
$71,648.2
$54,508.1
$80,000
$60,000
$40,000
$24,372.5
$21,763.3
$18,458.0
$15,255.4$14,556.7
$12,411.0
$9,369.8
$7,691.1
$7,504.5
$6,781.2
$3,273.4
$1,738.2
$1,459.0
$1,392.0
$1,369.0
$20,000
$0
$0.0 $0.0 $0.0 $0.0 $0.0
Fractura
Presupuesto
$8,000
Presupuesto vs Fractura
$7,000$6,000
$5,000
$4,780
$3,842
$4,000
$3,000
$2,000
$7,253.0
$2,987
$5,114.0
$2,560
$1,000
$0
ABR
$44.0
MAY
JUN
$0.0
JUL
$0
$0.0
AGO
$0
$0.0
SEP
$0
$0.0
OCT
$0
$0.0
NOV
$0
$0.0
DIC
$0
$0.0ENE
$0
$0.0
FEB
$0
$0.0
MAR
Condiciones de
corte NG, avance de
475 a 380(mm/min)
Top 10 Fractura ($)
$2,500.00
Falla de ATC AA-064,
tira herramienta
$2,000.00
2
$1,500.00
2
$2,012.0...
Regístrate para leer el documento completo.