Au (0.136-0.02) x0.925x (177.5-0.75) = $18.965
Ag (3.12-1.00) x0.95x (4.21-0.06) = $8.358
Cu (2.93-1.00)x0.975x20x (0.636-0.06) = $21.677
$49.027
Deducciones :

Cobro base = $35.00
Transporte = 0.12x20 = $2.4
Costo minado= $25.00
$62.4Ley de concentrado:

Pagos :
Au (0.964-0.02) x0.925x (177.5-0.75) = $154.338
Ag (22.18-1) x0.950x (4.21-0.06) = $83.502
Cu (20.83-1)x0.975x20x (0.636-0.06) = $222.73
Pb (7.536-1.5) x0.95x20x (0.245-0.047) = $22.707$483.495

Deducciones :
Cobro base = $35.00
Transporte = 0.17x20 = $3.4$38.4

Valor de mina por TCS = 445.09
Valor concentrado = 
Valor concentrado = 445.095/7.9 = $56.341

Menor Costo (Planta)100Tn/d ÷$7000/Tn = $700 000
n = 2 años i = 8 %


816480/50000(reserva) = $16.329

($56.34-$16.329) = $40.011
Costo Minado = $25
$15.011 (gananciapor tonelada)

Producción Anual = 100Tn/d x 250d/año = $25000Tn/año
Ganancia Anual = 25000x15.011 = $375275/año




Método de Hoskold:
P = [i/ (1+i) n-1 + i]-1

P = [0.06/(1.062-1) +0.15]-1 = 1.574
Vp = $375275 x 1.574 = $590682.85
Valor presente a 2 años = $590682.85[1/(1.06)2]
= $525705.634




















EVALUACIÓN Y DESARROLLO DE UN PROYECTO

Pagos:
Pb (8-1.5) x 0.75...
Leer documento completo

Regístrate para leer el documento completo.

Estos documentos también te pueden resultar útiles

  • Planta Concentradora
  • Planta Concentradora
  • Planta Concentradora
  • Plantas concentradoras
  • Procesos Planta Concentradora
  • Planta Concentradora Huari
  • Flow sheet de planta concentradora de relaves
  • Planta Concentradora

Conviértase en miembro formal de Buenas Tareas

INSCRÍBETE - ES GRATIS