Inventarios
PROGRAMACION DE OBRA – SEPTIEMBRE 14 DE 2010
PRECEDE | ACTIVIDAD | SIGUE | CANTIDAD | R/UNIT | R/TOTAL | OBS. | V/UNIT | V/TOTAL | V/DIA |V/TOTAL |
- | I.O | DESCAPOTE | | | 1 D | cuadrillas | | | | |
| | CERRAMIENTO | | | | | | | | |
IO | DESCAPOTE | REPLANTEO | 24M2 | 1.28 /HC | 3.84D/2=1.92D | 2A | $3870 | $92.886| $48378 | |
IO | CERRAMIENTO | B.COMPACTACION | 28ML | 1.40/HC | 4.9D/2 =2.45D | 2A | $30263 | $847.364 | $345862 | |
| | CAJA INSPECCION | | | | | | | | |
| | P.HUMEDOS | | || | | | | |
| | | | | | | | | | |
DESCAPOTE | REPLANTEO | B.COMPACTACION | 24M2 | 1.29/HC | 3.87D/2=1.93D | 2A | $5718 | $137232 | $71104 | |
| | CAJA INSPECCION | | || | | | | |
| | P.HUMEDOS | | | | | | | | |
| | | | | | | | | | |
CERRRAMIENTO | B.COMPACTACION | VIGA CIMENTACION | 4.82M3 | 0.80/HC | 0.48D | A | $72137 | $347.700 |$347700 | |
| | | | | | | | | | |
CERRAMIENTO | CAJAS INSPECCION | PLACA CONTRAPISO | 2UN | 3.20/HC | 0.80D | A | $180000 | $360.000 | $360000 | |
REPLANTEO | | | | | | || | | |
CERRAMIENTO REPLANTEO | PUNTO HUMEDOS | PLACA CONTRAPISO | 14ML | 1.89/HC | 3.30D/2=1.65D | 2A | $85643 | $1.199.004 | $726669 | |
| | | | | | | | | | |
COMPACTACION B |VIGA CIMENTACION | PLACA CONTRAPISO | 1.63M3 | 0.89/HC | 0.18D | A | $384786 | $627.201 | $627201 | |
CAJAS INSPECCION | PLACA CONTRAPISO | MAMPOSTERIA ESTRUCTURAL | 11.96M3 | 0.68/HC | 1.13D | A| $65515 | $783.559 | $693412 | |
PUNTOS HUMEDOS | | | | | | | | | | |
VIGA CIMENTACION | | | | | | | | | | |
PLACA CONTRAPISO | MAMPOSTERIA ESTRUCTURAL | FUNDIR DOVELAS |93M2 | 0.99/HC | 11.57D | A | $57972 | $5.391.396 | $465980 | |
| | INST SUMINIST | | | | | | | | |
| | INST SANIT Y VENTIL | | | | | | | | |
| | INST ELECTRICAS | |...
Regístrate para leer el documento completo.