Pruebas electricas a pararrayos
Silicon Carbide
Metal Oxide
Shunt Resistor Gap Valve Element
(MCOV & MOV)
Older Designs
Newer Designs
2
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry
Doble Engineering Company 7/7/09 1
Surge Arresters
Normal Condition ==> Insulator Instant of Disturbance ==> Conductor Passing of Disturbance ==> InsulatorNon-Linear Volt-Ampere Characteristic Dielectric-Loss Test - Not a Test of The Arrester’s Protective Characteristics
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry
3
Silicon Carbide
100KV 69KV 100KV 69KV
Metal Oxide
•Over design ratings it dissipates the impulse •Drops down to zero •Generates its own impulse
•Over design ratings it dissipates theimpulse •Clamps the voltage •Doesn’t drop to zero •Doesn’t generate its own impulse
4
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry
Doble Engineering Company 7/7/09 2
Surge Arresters
To make comparisons meaningful, arresters must be tested at the same voltage levels For recommended test voltages:
M2H Manual, page 4-118 M4K Manual, page 8-138Clean all porcelain surfaces to minimize surface leakage
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry
5
Refer to Tabulation in the Doble Test Data-Reference Book
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 6
Doble Engineering Company 7/7/09 3
Surge Arresters
Single Arrester:
High Voltage Lead
CKTSW
CKT SW
A
Test Set Step-Up XFMR Guard LVL
I&W Meter
GND Lead
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry
1. Bus must be disconnected from top of unit. 2. Place HV test lead as shown. 3. If discharge counter present, place jumper from bottom of arrester to ground, bypassing the counter. 4. Connect test set ground to grounded structuresupporting arrester stack. 5. Use a GST-Ground test circuit.
HV Cable
Test Set Ground Lead
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry
8
Doble Engineering Company 7/7/09 4
Surge Arresters
Two Arresters:
High Voltage Lead
CKT SW
CKT SW
A
Test Set Step-Up XFMR
Guard
B
GND Lead LVL I&W Meter
89 Years of DiagnosticInstrumentation and Services for the Electric Power Industry
9
1. Place test leads as shown. Colors may be interchanged. Bus must be disconnected from top unit.
Red/Blue LV Lead
1
A 2. If discharge counter present, place High Voltage Lead jumper from bottom of B to ground, bypassing the counter. B 3. Connect test set ground to grounded structure supporting arrester stack. Test Set
GroundLead
2
3
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry
10
Doble Engineering Company 7/7/09 5
Surge Arresters
4. A and B must be measured one at a time as follows:
Choose This Circuit UST Measure Red GST Guard Red To Measure A B
Red/Blue LV Lead
1
5. Use the multiple test choice to speed testing 6. This example uses the Red lead.The blue lead could have been used instead, and all test circuit choices would then have the red replaced by blue.
A
High Voltage Lead
2
B
3
Test Set Ground Lead
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry
11
1
Test #1
A
2
B
3
No. Mode Energize Ground Measure 1 GST 1 2 A
89 Years of Diagnostic Instrumentation and Servicesfor the Electric Power Industry 12
Doble Engineering Company 7/7/09 6
Surge Arresters
Test #2 1
A
2
B
3
No. Mode Energize Ground Measure 2 GST 2 3 B
89 Years of Diagnostic Instrumentation and Services for the Electric Power Industry 13
1
Test #1A
A
2
B
3
No. Mode Energize Ground Guard UST Measure 1A UST 2 3 ---1 A