Ingeniero civil
10 95 75
TALLAHASSEE PENSACOLA
10
JACKSONVILLE
295
LAKE CITY
DELAND
4
ORLANDO
75
BEE LINE EXPRESSWAY
4
FINANCIAL PROJECT ID 420809-3-52-01
TAMPA
F
L
O
T
R
ID
U
A S
P IK E
BROWARD COUNTY (86095)
INDEX OF ITS PLANS
SHEET NO. SHEET DESCRIPTION
PROJECT LOCATION
275
75
FT PIERCE
95
STATE ROAD NO. 862 (I-595) / NO.84 PROJECT SEGMENT DESCRIPTION
NAPLES
75
75
FT LAUDERDALE MIAMI
IT-1 IT-2 IT-3 TO IT-9 IT-10 IT-11 IT-12 IT-13 IT-14 INDEX NO. 18202 INDEX NO. 18204
KEY SHEET GENERAL NOTES AND LEGEND ITS INFRASTRUCTURE PLAN CONDUIT PLACEMENT DETAIL CONDUIT & PULL BOX INSTALLATION DETAIL FIBER MARKER DETAIL POWER SERVICE ELECTRICAL DETAIL EMERGENCY ACCESS GATES SUBSYSTEM ITS CONDUIT LAYOUT FIBEROPTIC PULL BOX AND TRENCH DETAILS FIBER OPTIC SPLICE BOX AND PULL BOX
CONSTRUCTION PACKAGE NO. 609-001
KEY WEST
GOVERNING STANDARDS AND SPECIFICATIONS: FLORIDA DEPARTMENT OF TRANSPORTATION, DESIGN STANDARDS DATED 2008, AND STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION DATED 2007, AS AMENDED BY CONTRACT DOCUMENTS.
ITS INFRASTRUCTURE SHOP DRAWINGS TO BE SUBMITTED TO:
90%SUBMITTAL DECEMBER 15, 2009
REYNALDO R. RIVAS, PE
PLANS PREPARED BY:
R.J. Behar & Company, Inc.
Engineers Planners
F.R. ALEMAN & ASSOCIATES, INC. 10305 NW 41 ST, SUITE 200 MIAMI, FL 33178 CERTIFICATE OF AUTHORIZATION NO. 4658 VENDOR NO. 00012014
NOTE: THE SCALE OF THESE PLANS MAY HAVE CHANGED DUE TO REPRODUCTION.
KEY SHEET REVISIONS
ITS PLANS
Kimley-Horn and Associates, Inc.DATE
BY
DESCRIPTION ENGINEER OF RECORD:
AMAZIA L. KIBOKO, P.E.
P.E. NO.:
49523
FISCAL YEAR
& Associates, Inc.
CONSULTING ENGINEERS & SURVEYORS
SHEET NO.
FDOT PROJECT MANAGER: JOSEPH BORELLO
_USER_ 12/14/2009 1:00:18 PM P:\2202\42080935201\its\Zone_6\Keysit06.dgn
09
IT-1
CONSTRUCTION PACKAGE NO. 609-001
AECOM TECHNICAL SERVICES, INC 10368 STATE ROAD 84 SUITE201 DAVIE, FL 33324
AMAZIA L. KIBOKO, PE Florida License No. 49523 10305 N.W. 41 STREET, SUITE 200 MIAMI, FL 33178
NOT FOR CONSTRUCTION
BARTOW
R
N
90% DESIGN SUBMITTAL
DATE: 12/14/2009
783-4-111
INCLUDES THE COST OF FURNISHING AND INSTALLING ALL BRIDGE MOUNTING HARDWARE, EXPANSION JOINTS, COUPLING DEVICES, JUNCTION BOXES, DUCT PLUGS, PULL TAPES AND ALL OTHER RECOMMENDEDEQUIPMENT AND HARDWARE FOR THE CONDUIT INSTALLATION AS RECOMMENDED BY THE MANUFACTURER.
1)
ELECTRIC POWER SERVICE POINTS SHALL BE INSTALLED IN ACCORDANCE WITH FDOT INDEX NO. 17736 AND INCLUDE A MAIN SERVICE DISCONNECT AT THE IDENTIFIED SERVICE POLE. 783-4-113 ONE FOOT OF 2" HDPE DUCTS IS PAID AS ONE FOOT OF ITS CONDUIT. THE BID ITEM SHALL INCLUDE THE COST FOR ALL LABOR, EQUIPMENT ANDMATERIALS FOR REMOVAL, STOCK-PILING AND RESTORATION OF
90% DESIGN SUBMITTAL
SHEET NO.
2) 1) GENERAL AND UTILITY NOTES ARE IN ADDITION TO THE ROADWAY PLAN NOTES WITHIN THE PLANSET.
PAYMENT FOR CONDUIT SHALL BE BASED ON THE HORIZONTAL PATH OF THE INSTALLED CONDUIT AS MEASURED BETWEEN THE CENTERS OF PULL BOXES, CABINETS, ECT. NO ALLOWANCE SHALL BE MADE FOR SWEEPS OR VERTICAL DISTANCES ABOVETRENCH INCLUDING BACKFILLING WITH FLOWABLE FILL (IF REQUIRED), RESTORING FLEXIBLE PAVEMENT, CONCRETE PAVEMENT, SLOPE PAVEMENT, CURB AND GUTTER OR GRASS AREAS DISTURBED OR DAMAGED BY THE CONDUIT INSTALLATION OPERATIONS. INCLUDES THE COST OF REPLACING PAVEMENT MARKINGS (IN KIND) AND RPM’S DAMAGED WHILE INSTALLING PAVEMENT CONDUITS. THE BID ITEM SHALL ALSO INLCUDE THE COST OF
2)
ALL ITSEQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE APPLICABLE SECTIONS OF THE 18000 SERIES INDICES. 3)
OR BELOW GROUND.
ALL NEWLY INSTALLED CONDUIT SHALL BE INSTALLED AND MARKED TO PREVENT FUTURE CONSTRUCTION PHASES FROM DAMAGING CONDUIT.
FURNISHING AND INSTALLING ALL MANUFACTURER RECOMMENDED CONNECTORS, FITTINGS, RINGS, TERMINATORS ECT. AS WELL AS LOCATE WIRES, WARNING TAPE, LOCATION SYSTEM...