El concreto
ITEM 91001 91002 91003 91004 91005 91006 91007 91008
DESCRIPCION DE PARTIDA CONCRETO CICLOPEO 1:6(C:H)+30% P.G.-CIMIENTOS CORRIDOSCONCRETO CICLOPEO 1:8(C:H)+30% P.G.-CIMIENTOS CORRIDOS CONCRETO CICLOPEO 1:10(C:H)+30% P.G.-CIMIENTO CORRIDOS CONCRETO PREMEZCLADO F'C 100 kg/cm2 - CMTO. CORRIDO CONCRETO PREMEZCLADO F'C 120 kg/cm2 -CMTO. CORRIDO CONCRETO PREMEZCLADO F'C 140 kg/cm2 - CMTO. CORRIDO CONCRETO F'C 80 KG/CM2-CIMIENTOS CORRIDOS CONCRETO F'C 100 KG/CM2-CIMIENTOS CORRIDOS
UND m3 m3 m3 m3 m3 m3 m3 m3
COSTO TOTAL S/.141.77 139.87 128.68 220.86 223.95 228.07 176.78 183.35
MO 44.12 44.12 44.12 30.18 30.18 30.18 44.12 44.12
MAT 87.99 85.2 74.01 187.46 190.55 194.67 123 129.57
EQUIPO 9.66 10.55 10.55 3.223.22 3.22 9.66 9.66
91501 91502 91503 91504 91505 91506 91507 91401 91402 91403 91404
FALSOPISO DE 3" CON MEZC.1:6 C:H FALSOPISO DE 3" CON MEZC.1:8 C:H FALSOPISO DE 4" CON MEZC.1:6 C:H FALSOPISODE 4" CON MEZC.1:8 C:H CONCRETO PREMEZCLADO F'C 100 kg/cm2 - FALSO PISO CONCRETO PREMEZCLADO F'C 120 kg/cm2 - FALSO PISO CONCRETO PREMEZCLADO F'C 140 kg/cm2 - FALSO PISO CONCRETO 1:10 (C:H) GRADAS YRAMPAS CONCRETO F'C 140 KG/CM2 GRADAS Y RAMPAS CONCRETO F'C 175 KG/CM2 GRADAS Y RAMPAS ENCOFRADO Y DESENCOFRADO NORMAL GRADAS Y RAMPAS
m2 m2 m2 m2 m3 m3 m3 m3 m3 m3 m2
19.08 17.61 23.42 23.36215.28 218.37 222.49 178.26 245.74 265.31 47.26
7.47 7.47 8.5 10.25 25.15 25.15 25.15 73.53 80.49 80.49 34.96
9.57 8.1 12.6 10.91 187.46 190.55 194.67 87.15 142.81 162.38 10.55
2.04 2.04 2.32 2.22.67 2.67 2.67 17.58 22.44 22.44 1.75
91301 91302 91303 91304 91201
CONCRETO 1:6 (C:H) + 25% P.M.-SOBRECIMIENTOS CONCRETO 1:8 (C:H) + 25% P.M.-SOBRECIMIENTOS CONCRETO F'C 100KG/CM2-SOBRECIMIENTOS ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTOS CONCRETO C:H 1:10 E=2"-SOLADO
m3 m3 m3 m2 m2
211.65 194.87 259.97 29.91 18.29
91.91 91.91 100.61 13.11 11.03
99.61 82.83 131.31...